Work Details

Sl.NoworkcodeYearTypeDistrictTalukaVillageCategorySub TypeSectorSub SectorSub Sector TypeAgencySubDivisionImplemented ByPlan Approval DateWork Name in EnglishWork Name in KannadaApproved AllocationADM Approval DateADM AmountTechnical Approval DateTechnical AmountTender Notification DateTender Approval DateTender AmountWork Order Approval DateWork Order AmountExpenditureWork StatusWorkStatusDescriptionRemarksLast Modified On
1 BDR1612110062016-17MICROBidarAuradOthersSCP InstitutionalWomen & ChildOthersOthersPREDPRED AuradCEO15/07/2016 ಘಮಸುಬಾಯಿ ತಾಂಡಾದಲ್ಲಿ ಅಂಗನವಾಡಿ ಕಟ್ಟಡ ನಿರ್ಮಾಣ, {Baby toilet,compound wall,bore well ,electrification,syntex over head tank,water pipeline to kitchen room,and fan and light plug points.}13.7521/09/201613.75013/10/201613.75021/01/201722/03/201713.72022/03/201713.7209.590CompletedPhysically Completed 14/08/2019 12:45:34
2 BDR1612110072016-17MICROBidarAuradOthersSCP InstitutionalWomen & ChildOthersOthersPREDPRED AuradCEO15/07/2016 ರಾಮಸಿಂಗನಾಯಕ ತಾಂಡಾದಲ್ಲಿ ಅಂಗನವಾಡಿ ಕಟ್ಟಡ ನಿರ್ಮಾಣ {Baby toilet,compound wall,bore well ,electrification,syntex over head tank,water pipeline to kitchen room,and fan and light plug points.}13.7528/11/201613.75005/01/201713.75021/01/201724/03/201713.00024/03/201713.0008.790CompletedPhysically Completed  14/08/2019 12:45:56
3 BDR1612112172016-17MICROBidarAuradHangergaSCP InstitutionalEducationOthersOthersPWDPWD AuradDC28/09/2016ಹಂಗರಗಾ ಗ್ರಾಮದ ಸರ್ಕಾರಿ ಪ್ರಾಥಮಿಕ ಶಾಲಾ ಕಟ್ಟಡ ನಿರ್ಮಾಣ (Including Electrification,Fan & Light Fitting and Plug provision) ಹಂಗರಗಾ ಗ್ರಾಮದ ಸರ್ಕಾರಿ ಪ್ರಾಥಮಿಕ ಶಾಲಾ ಕಟ್ಟಡ ನಿರ್ಮಾಣ (Including Electrification,Fan & Light Fitting and Plug provision) 25.0011/01/201725.00022/05/201725.00023/05/201719/06/201724.54027/06/201721.65019.850Completedcompleted 29/07/2019 19:04:57
4 BDR1612120102016-17MICROBidarAuradSanthpurTSP InstitutionalHealthOthersOthersPWDPWD AuradDC06/01/2017 ಆರೋಗ್ಯ ಕೇಂದ್ರ ಸಂತಪೂರ1 ನರ್ಸ ವಸತಿಗೃಹಗಳ ನಿರ್ಮಾಣ ಮಾಡುವುದು. WITH SINGLE 2BHK ROOMS [including electrification,water supply,and sanitation]16.9807/01/201716.98015/03/201716.98016/03/201731/03/201715.96031/03/201714.18014.170Completedcompleted 10/08/2019 17:43:51
5 BDR1612130142016-17MICROBidarAuradHolesamudraGeneralInstitutionalHealthOthersOthersPWDPWD AuradDC06/01/2017 ಹೋಳೆಸಮುದ್ರ ಗ್ರಾಮದಲ್ಲಿ ವೈದ್ಯಾಧಿಕಾರಿಗಳ ವಸತಿಗೃಹ ನಿರ್ಮಾಣ ಮಾಡುವುದು. WITH 3 BHK ROOMS.{including electrification,water supply,and sanitation}24.4810/01/201724.48015/03/201724.48016/03/201731/03/201723.37031/03/201720.79020.790Completedcompleted 10/08/2019 17:45:38
6 BDR1612130152016-17MICROBidarAuradSanthpurGeneralInstitutionalHealthOthersOthersPWDPWD AuradDC06/01/2017 ಸಂತಪೂರ ಗ್ರಾಮದಲ್ಲಿ ವೈದ್ಯಾಧಿಕಾರಿಗಳ ವಸತಿಗೃಹ ನಿರ್ಮಾಣ ಮಾಡುವುದು. WITH 3 BHK ROOMS.{including electrification,water supply,and sanitation}24.4807/01/201724.48015/03/201724.48016/03/201731/03/201723.37031/03/201720.79020.420Completedcompleted 10/08/2019 17:47:07
7 BDR1612130182016-17MICROBidarAuradSanthpurGeneralInstitutionalHealthOthersOthersPWDPWD AuradDC06/01/2017 ಸಂತಪೂರ ಗ್ರಾಮದಲ್ಲಿ ಹೆರಿಗೆ ಕೋಣೆ ನಿರ್ಮಾಣ ಮಾಡುವುದು.13.5607/01/201713.56015/03/201713.56016/03/201731/03/201712.49031/03/201711.18010.160Completedcompleted 10/08/2019 17:48:07
8 BDR1612132192016-17MICROBidarAuradHangergaGeneralInstitutionalSWOthersOthersPWDPWD AuradDC15/07/2016 ಹಂಗರಗಾ ಗ್ರಾಮದ ಸರಕಾರಿ ಪ್ರೌಢ ಶಾಲಾ ಕಟ್ಟಡ ನಿರ್ಮಾಣ (Including Electrification,Fan & Light Fitting and Plug provision) 57.8110/01/201757.81022/05/201757.81008/05/201719/06/201756.95019/06/201753.08042.330Completedcompleted 13/08/2019 14:49:16
9 BDR1612210202016-17MICROBidarAuradOthersSCP InfrastructureRoads & BridgesOthersOthersPMGSYPMGSY BidarCEO15/07/2016 ಬಬನ್ ನಾಯಕ ತಾಂಡಾದಿಂದ ಚಿಕಲಿ(ಯು) ವರೆಗೆ ರಸ್ತೆ ನಿರ್ಮಾಣ 2 ಕಿ.ಮೀ80.0021/09/201680.00004/01/201780.00031/01/201731/07/201788.96005/08/201788.96086.570CompletedCompleted 06/03/2019 12:57:45
10 BDR1612210212016-17MICROBidarAuradOthersSCP InfrastructureRoads & BridgesOthersOthersPMGSYPMGSY BidarCEO15/07/2016 ಬೋಂತಿಯಿಂದ ವಜ್ಜರ ವಾಯಾಥಾವ್ರಾನಾಯಕ ತಾಂಡಾವರೆಗೆ ರಸ್ತೆ ನಿರ್ಮಾಣ80.0021/09/201680.00004/01/201780.00031/01/201731/07/201789.40005/08/201789.40085.320CompletedCompleted 06/03/2019 12:57:45
11 BDR1612210222016-17MICROBidarAuradOthersSCP InfrastructureRoads & BridgesOthersOthersPMGSYPMGSY BidarCEO15/07/2016 ಮಾಳೆಗಾಂವ ದಿಂದ ರೂಪ್ಲಾ ತಾಂಡಾವರೆಗೆ ರಸ್ತೆ ನಿರ್ಮಾಣ (ವಾಯಾ:ಮಹಾದೇವತಾಂಡ)80.0021/09/201680.00007/01/201780.00031/01/201731/07/201789.50005/08/201789.50080.990CompletedCompleted 06/03/2019 12:57:45
12 BDR1612212212016-17MICROBidarAuradOthersSCP InfrastructureWater SupplyOthersOthersRWSRWS AuradCEO28/09/2016 Augmentation of PWS at Balat (B)18.8302/01/201718.83025/01/201718.830 15/06/201717.51005/07/201717.51013.680CompletedPhysically completedPhysically completed06/03/2019 12:57:49
13 BDR1612220232016-17MICROBidarAuradOthersTSP InfrastructureRoads & BridgesOthersOthersPWDPWD AuradDC26/10/2016 ಕೋರೆಕಲ್ ನಿಂದ ಬೆಡಕುಂದಾವರೆಗೆ ರಸ್ತೆ ನಿರ್ಮಾಣ (ವಾಯಾ ಲಕ್ಷ್ಮೀನಗರ)100.2327/10/2016100.23009/12/2016100.23019/12/201708/02/201799.17009/03/201788.00088.000CompletedCompleted 10/08/2019 17:50:27
14 BDR1612230242016-17MICROBidarAuradMudhole(B)GeneralInfrastructureRoads & BridgesOthersOthersPMGSYPMGSY BidarCEO15/07/2016 ಮುಧೋಳದಿಂದ ಲಿಂಗದಳ್ಳಿವರೆಗೆ ರಸ್ತೆ ನಿರ್ಮಾಣ (1.5 km)60.0021/09/201660.00004/01/201760.00031/01/201731/07/201766.83005/08/201766.83066.520Completed completed. 20/03/2019 13:36:21
15 BDR1612230252016-17MICROBidarAuradKhatgaonGeneralInfrastructureRoads & BridgesOthersOthersPMGSYPMGSY BidarCEO15/07/2016 ಖತಗಾಂವದಿಂದ ಮದನೂರು ವರೆಗೆ ರಸ್ತೆ ನಿರ್ಮಾಣ (1 km)40.0021/09/201640.00003/11/201640.00031/01/201731/07/201744.60005/08/201744.60044.210Completed completed 20/03/2019 13:20:36
16 BDR1612230262016-17MICROBidarAuradMurkiGeneralInfrastructureRoads & BridgesOthersOthersPMGSYPMGSY BidarCEO15/07/2016 ಮುರ್ಕಿಯಿಂದ ರಾವಣಗಾಂವ (Msborder) ವರೆಗೆ ರಸ್ತೆ ನಿರ್ಮಾಣ (2 km)80.0021/09/201680.00004/01/201780.00031/01/201731/07/201789.04005/08/201789.04059.430Completedcompleted 20/03/2019 13:21:15
17 BDR1612230272016-17MICROBidarAuradMahadongaonGeneralInfrastructureRoads & BridgesOthersOthersPMGSYPMGSY BidarCEO15/07/2016 ಮಹಾಡೋಣಗಾಂವ ದಿಂದ ಹಿಪ್ಪಳಗಾಂವವರೆಗೆ ರಸ್ತೆ ನಿರ್ಮಾಣ (2 km)80.0021/09/201680.00004/01/201780.00031/01/201731/07/201789.61005/08/201789.61088.580Completedcompleted 20/03/2019 13:27:00
18 BDR1612230282016-17MICROBidarAuradChatnalGeneralInfrastructureRoads & BridgesOthersOthersPMGSYPMGSY BidarCEO15/07/2016 ಚಟನಾಳದಿಂದ ಜೀರಗಾವರೆಗೆ ರಸ್ತೆ ನಿರ್ಮಾಣ (2 km)80.0021/09/201680.00004/01/201780.00031/01/201731/07/201789.18005/08/201789.18085.900Completedphysically completedphysically completed 20/03/2019 13:27:40
19 BDR1612230292016-17MICROBidarAuradAlur (B)GeneralInfrastructureRoads & BridgesOthersOthersPMGSYPMGSY BidarCEO15/07/2016 ಆಲೂರು ದಿಂದ ಬೇಲೂರುವರೆಗೆ ರಸ್ತೆ ನಿರ್ಮಾಣ (1 km)40.0021/09/201640.00003/11/201640.00031/01/201731/07/201744.51005/08/201744.51041.070CompletedPhysically Completed 20/03/2019 13:29:04
20 BDR1612230302016-17MICROBidarAuradOthersGeneralInfrastructureRoads & BridgesOthersOthersPMGSYPMGSY BidarCEO15/07/2016 ಶಿಚಪೂರದಿಂದ ಡೋಣಗಾಂವ (M) ವರೆಗೆ ರಸ್ತೆ ನಿರ್ಮಾಣ (1 km)40.0021/09/201640.00003/11/201640.00031/01/201731/07/201744.57005/08/201744.57039.090CompletedPhysically CompletedPhysically Completed,06/03/2019 12:57:45
21 BDR1612230312016-17MICROBidarAuradKaranji (B)GeneralInfrastructureRoads & BridgesOthersOthersPMGSYPMGSY BidarCEO15/07/2016 ಕರಂಜಿ (ಬ) ದಿಂದ ದೇಗಲವಾಡಿ ಆಂದ್ರ ಗಡಿ ವಾಯಾ ಕರಂಜಿ(ಕೆ)ಯವರೆಗೆ ರಸ್ತೆ ನಿರ್ಮಾಣ (2.00 ಕಿ.ಮೀ)80.0021/09/201680.00004/01/201780.00031/01/201709/06/201772.47030/06/201772.47071.650Completedphysically completedphysically completed20/03/2019 13:32:42
22 BDR1612230322016-17MICROBidarAuradBeldhalGeneralInfrastructureRoads & BridgesOthersOthersPMGSYPMGSY BidarCEO15/07/2016 ಬೆಲ್ದಾಲದಿಂದ ಗುಡಪಳ್ಳಿವರೆಗೆ ರಸ್ತೆ ನಿರ್ಮಿಸುವುದು (2 km)80.0021/09/201680.00004/01/201780.00031/01/201709/06/201772.34030/06/201772.34066.470Completedphysically completedfinancially in progress20/03/2019 13:33:14
23 BDR1612230332016-17MICROBidarAuradJeerga (K)GeneralInfrastructureRoads & BridgesOthersOthersPMGSYPMGSY BidarCEO15/07/2016 ಜಿರಗಾ (ಕೆ) ದಿಂದ ಜಿರಗಾ (ಬಿ) ವರೆಗೆ ರಸ್ತೆ ನಿರ್ಮಾಣ66.1121/09/201666.11004/01/201766.11031/01/201709/06/201759.77030/06/201759.77058.320CompletedPhysically Completed 20/03/2019 13:34:15
24 BDR1612230342016-17MICROBidarAuradShambelliGeneralInfrastructureRoads & BridgesOthersOthersPMGSYPMGSY BidarCEO15/07/2016 ಶೆಂಬೆಳ್ಳಿಯಿಂದ ಧರಿಹನುಮಾನ ವರೆಗೆ ರಸ್ತೆ ನಿರ್ಮಾಣ80.0021/09/201680.00004/01/201780.00031/01/201709/06/201772.34030/06/201772.34067.130CompletedPhysically completed  20/03/2019 13:37:16
25 BDR1612232252016-17MICROBidarAuradJonnekeriGeneralInfrastructureWater SupplyOthersOthersRWSRWS AuradCEO28/09/2016 Augmentation of PWS at Jonnikeri20.0002/01/201720.00025/01/201720.00020/05/201705/07/201720.00006/07/201716.57016.570CompletedCompletedCompleted20/03/2019 13:37:54
26 BDR1612232272016-17MICROBidarAuradHokranaGeneralInfrastructureWater SupplyOthersOthersRWSRWS AuradCEO28/09/2016 ಹೊಕ್ರಾಣಾ ಗ್ರಾಮದಲ್ಲಿ ಪೈಪ್ ಲೈನ್ ಮುಖಾಂತರ ನೀರು ಸರಬರಾಜು ಅಳವಡಿಸುವುದು20.0002/01/201720.00025/01/201720.000 04/05/201719.16010/05/201718.97018.960Completed CompletedPhysically Completed19/08/2019 19:02:51
27 BDR1612232372016-17MICROBidarAuradAurad (TP)GeneralInfrastructureRoads & BridgesOthersOthersTown Panchayat Aurad DC15/07/2016 ಔರಾದ ಡಿಗ್ರಿ ಹಾಸ್ಟೆಲ್ ನಿಂದ ಹಮಾಲ್ ಕಾಲೋನಿವರೆಗೆ ಸಿಸಿ ರಸ್ತೆ ನಿರ್ಮಾಣ 20.0019/12/201620.00002/01/201720.00022/02/201715/02/201720.00008/05/201720.00018.680CompletedWork CompletedWork Completed10/08/2019 17:53:11
28 BDR1612232382016-17MICROBidarAuradAurad (TP)GeneralInfrastructureRoads & BridgesOthersOthersTown Panchayat Aurad DC15/07/2016 ದತ್ತಮಂದಿರದಿಂದ ಎಪಿಎಂಸಿ ತಾಂಡದವರೆಗೆ ಸಿಸಿ ರಸ್ತೆ ನಿರ್ಮಾಣ 25.0019/12/201625.00002/01/201725.00022/02/201715/02/201725.00008/05/201725.00011.620CompletedWork CompletedWork Completed10/08/2019 17:53:40
29 BDR1612232392016-17MICROBidarAuradAurad (TP)GeneralInfrastructureRoads & BridgesOthersOthersTown Panchayat Aurad DC15/07/2016 ಔರಾದ ರಿಂಗ್ ರೋಡದಿಂದ ಮಹಾದೇವ ಮಂದಿರದವರೆಗೆ ಸಿಸಿ ರಸ್ತೆ ನಿರ್ಮಾಣ 25.0019/12/201625.00002/01/201725.00022/02/201715/02/201725.00008/05/201725.00020.550CompletedWork CompletedWork Completed10/08/2019 17:54:02
30 BDR1622110972016-17MICROBidarBhalkiBhalki (TMC)SCP InstitutionalSWOthersOthersPWDPWD BhalkiDC15/07/2016 ಭಾಲ್ಕಿ ಪಟ್ಟಣದ ಸಮಾಜ ಕಲ್ಯಾಣ ಇಲಾಖೆಯ ಮೇಟ್ರಿಕ್ ನಂತರದ ಬಾಲಕರ ವಸತಿ ನಿಲಯ ಕಟ್ಟಡ ನಿರ್ಮಾಣ [including electrification,water supply and sanitation] (ಪ್ರಸ್ತುತ ಇರುವ ಕಟ್ಟಡ ಶಿಥಿಲಾವಸ್ಥೆಯಲ್ಲಿರುವುದರಿಂದ)178.3301/12/2016178.33003/01/2017178.33018/01/201728/06/2017177.99020/07/2017177.990143.100Completed completed  24/06/2019 13:41:21
31 BDR1622120982016-17MICROBidarBhalkiBhalki (TMC)TSP InstitutionalHealthOthersOthersPWDPWD BhalkiDC15/07/2016 ಭಾಲ್ಕಿ ತಾಲೂಕ ಸರಕಾರಿ ಆಸ್ಪತ್ರೆಯಲ್ಲಿ ಒಂದು ಮಾದರಿ ಶೌಚಾಲಯ ನಿರ್ಮಾಣ.10.0014/10/201610.00004/11/201610.00011/11/201608/12/20169.74016/12/20168.6908.090CompletedCompleted 24/06/2019 13:41:47
32 BDR1622131012016-17MICROBidarBhalkiBhalki (TMC)GeneralInstitutionalEducationOthersOthersPWDPWD BhalkiDC15/07/2016 ಭಾಲ್ಕಿ ಪಟ್ಟಣದ ಸರಕಾರಿ ಪದವಿ ಕಾಲೇಜಿನಲ್ಲಿ ನಾಲ್ಕು ಹೊಸ ತರಗತಿ ಕೋಣೆಗಳ ನಿರ್ಮಾಣ ಮಾಡುವುದು. {Including electrification,fan and light.and plug provision}41.2519/11/201641.25029/11/201641.25007/12/201627/12/201639.32006/01/201739.32037.580Completedcompleted 19/06/2019 13:17:31
33 BDR1622131022016-17MICROBidarBhalkiBhalki (TMC)GeneralInstitutionalEducationOthersOthersPWDPWD BhalkiDC15/07/2016 ಭಾಲ್ಕಿ ತಾಲೂಕಿನ ಮೇಹಕರ ಸರಕಾರಿ ಪ್ರೌಢ ಶಾಲೆಯಲ್ಲಿ 10 ಕೋಣೆಗಳ ನಿರ್ಮಾಣ ಮಾಡುವುದು. {Including electrification,fan and light.and plug provision}100.8927/10/2016100.89007/01/2017100.89018/01/201725/04/201799.62012/06/201799.62099.620Completedcompletion  19/06/2019 13:18:11
34 BDR1622131032016-17MICROBidarBhalkiOthersGeneralInstitutionalEducationOthersOthersPWDPWD BhalkiDC15/07/2016 ಭಾಲ್ಕಿ ತಾಲೂಕಿನ ಐದು ಸರಕಾರಿ ಪ್ರೌಢ ಶಾಲೆಗಳಿಗೆ (1) ಮಳಚಾಪೂರ, (2) ಕೋಣಮೇಳಕುಂದಾ, (3) ಭಾಲ್ಕಿ, (4) ನಿಟ್ಟೂರ (ಬಿ) (5) ಕಾಕನಾಳ ತಲಾ ಒಂದು ಕೋಣೆ ನಿರ್ಮಾಣ. {Including electrification,fan and light.and plug provision}40.8511/01/201740.85022/05/201740.85023/05/201719/06/201738.27011/07/201738.27034.830Completedcompleted 19/06/2019 13:18:42
35 BDR1622211072016-17MICROBidarBhalkiOthersSCP InfrastructureRoads & BridgesOthersOthersPWDPWD BhalkiDC15/07/2016 ಖಂಡ್ರೆ ತಾಂಡಾಕ್ಕೆ ಕೊಡು ರಸ್ತೆ ನಿರ್ಮಾಣ (ಕಿ.ಮೀ.1.20)75.0029/09/201675.00028/10/201675.00010/11/201614/12/201674.61016/12/201674.61065.360CompletedCompleted 19/06/2019 13:22:49
36 BDR1622211082016-17MICROBidarBhalkiOthersSCP InfrastructureRoads & BridgesOthersOthersPWDPWD BhalkiDC15/07/2016 ಗರ್ಮಾ ತಾಂಡಾಕ್ಕೆ ಕೂಡು ರಸ್ತೆ ನಿರ್ಮಾಣ (ಕಿ.ಮೀ. 0.80)45.0014/10/201645.00008/11/201645.00010/11/201614/12/201642.35016/12/201642.35043.400CompletedCompleted 19/06/2019 13:21:24
37 BDR1622211092016-17MICROBidarBhalkiOthersSCP InfrastructureRoads & BridgesOthersOthersPWDPWD BhalkiDC26/10/2016 ಕಳಸದಾಳ ಗ್ರಾಮದ ಕೂಡು ರಸ್ತೆ ನಿರ್ಮಾಣ (ಕಿ.ಮೀ. 2.40)122.9327/10/2016122.93005/12/2016122.93012/12/201610/02/2017121.60009/03/2017121.600118.310CompletedCompleted 10/08/2019 18:38:52
38 BDR1622211102016-17MICROBidarBhalkiOthersSCP InfrastructureRoads & BridgesOthersOthersPWDPWD BhalkiDC15/07/2016 ಮೇಹಕರ-ತುಗಾಂವ (ಹೆಚ್) ರಸ್ತೆಯ ಕಿ.ಮೀ 0.70 ರಲ್ಲಿ ಸೇತುವೆ ನಿರ್ಮಾಣ20.0022/11/201620.00005/12/201620.00007/12/201726/12/201619.42006/01/201719.41019.420CompletedCompleted 19/06/2019 13:23:29
39 BDR1622231122016-17MICROBidarBhalkiOthersGeneralInfrastructureRoads & BridgesOthersOthersPWDPWD BhalkiDC30/03/2016 ಭಾಲ್ಕಿ ತಾಲ್ಲೂಕಿನ ಹುಪನಾ, ಹುಣಜಿ (ಕೆ), ಜ್ಯಾಂತಿ, ಹಲಬರ್ಗಾ, ನಾವದಗಿ, ತರನಳ್ಳಿ, ಸಿದ್ದೇಶ್ವರವಾಡಿ ಗ್ರಾಮಗಳಲ್ಲಿ ಸಿ.ಸಿ. ರಸ್ತೆ ಮತ್ತು ಚರಂಡಿ ನಿರ್ಮಾಣ.200.0026/04/2017200.00026/05/2017200.00001/07/201721/09/2017198.13022/03/2018197.930194.390Completedcompleted 19/06/2019 13:24:08
40 BDR1622231132016-17MICROBidarBhalkiHachi KamathGeneralInfrastructureRoads & BridgesOthersOthersPWDPWD BhalkiDC15/07/2016 ಹಚ್ಚಿಕಮಠ ಗ್ರಾಮದ ಕೂಡು ರಸ್ತೆ ನಿರ್ಮಾಣ (ಕಿ.ಮೀ.1.50)80.0014/10/201680.00022/11/201680.00007/12/201608/02/201779.25008/03/201779.25076.000CompletedCompleted  19/06/2019 13:24:36
41 BDR1622231142016-17MICROBidarBhalkiBhatambraGeneralInfrastructureRoads & BridgesOthersOthersPWDPWD BhalkiDC03/11/2016 ಭಾತಂಬ್ರಾ ದಿಂದ ಭಾಟಸಾಂಗವಿ ವರೆಗೆನ ಆಯ್ದ ಭಾಗಗಳಲ್ಲಿ ರಸ್ತೆ ನಿರ್ಮಾಣ.190.1115/11/2016190.11009/12/2016190.11019/12/201606/03/2017187.58031/03/2017187.580186.940Completedcompleted 10/08/2019 18:41:00
42 BDR1622231152016-17MICROBidarBhalkiBolegaonGeneralInfrastructureRoads & BridgesOthersOthersPWDPWD BhalkiDC15/07/2016 ಬೋಳೆಗಾಂವ ಗ್ರಾಮದ ರಸ್ತೆ ನಿರ್ಮಾಣ (ಕಿ.ಮೀ. 3.00)150.0027/10/2016148.27005/12/2016148.27012/12/201620/03/2017143.88024/03/2017143.880142.970Completedcompleted  20/03/2019 13:52:25
43 BDR1622231162016-17MICROBidarBhalkiBhalki (TMC) WARD NO.-0017GeneralInfrastructureRoads & BridgesOthersOthersPWDPWD BhalkiDC15/07/2016 ಭಾಲ್ಕಿ ಪಟ್ಟಣದ ವಾರ್ಡ ನಂ: 17 ರಲ್ಲಿ ಸಿ.ಸಿ ರಸ್ತೆ ಮತ್ತು ಚರಂಡಿ ನಿರ್ಮಾಣ.25.0029/09/201625.00018/10/201625.00010/11/201608/12/201622.01016/12/201621.86021.860CompletedCompleted 19/06/2019 13:27:03
44 BDR1622231172016-17MICROBidarBhalkiKommelkundaGeneralInfrastructureRoads & BridgesOthersOthersPWDPWD BhalkiDC15/07/2016 ಕೋಣಮೇಳಕುಂದಾ ಗ್ರಾಮಕ್ಕೆ ವರ್ತುಳ ರಸ್ತೆ ನಿರ್ಮಾಣ50.0014/10/201650.00025/11/201650.00007/12/201623/12/201646.88006/01/201746.88045.790CompletedCompleted 19/06/2019 13:27:43
45 BDR1632111422016-17MICROBidarHumnabadHomnabad (TMC)SCP InstitutionalBCMOthersOthersPWDPWD HumnabadDC15/07/2016 ಮೇಟ್ರಿಕ್ ಪೂರ್ವ ಬಾಲಕೀಯರ ವಸತಿ ನಿಲಯ ಹುಮನಾಬಾದ, ಹೆಚ್ಚುವರಿಯಾಗಿ 2 ವಿದ್ಯಾರ್ಥಿಗಳ ವಾಸದ ಕೋಣೆ ನಿರ್ಮಾಣ {Including electrification,fan and light.and plug provision}22.0014/10/201622.00007/11/201622.00007/12/201623/12/201619.29006/01/201719.29019.270CompletedCompleted 24/06/2019 13:42:18
46 BDR1632111432016-17MICROBidarHumnabadChitgoppa (TMC)SCP InstitutionalBCMOthersOthersPWDPWD HumnabadDC15/07/2016 ಮೇಟ್ರಿಕ್ ಪೂರ್ವ ಬಾಲಕೀಯರ ವಸತಿ ನಿಲಯ ಚಿಟ್ಟಗುಪ್ಪಾ, ಹೆಚ್ಚುವರಿಯಾಗಿ 2 ಸ್ನಾನದ ಗೃಹ ಶೌಚಾಲಯ ನಿರ್ಮಾಣ.10.0014/10/201610.00004/11/201610.00011/11/201608/12/20169.79016/12/20169.1909.190CompletedCompleted 24/06/2019 13:43:38
47 BDR1632111442016-17MICROBidarHumnabadMangalgiSCP InstitutionalEducationOthersOthersKRIDLKRIDL HumnabadCEO15/07/2016Construction of Three(3) class room ,Govt Higher Primary School (Kannada) in Mangalgi [Including electrification fans, light and plug provisions]Construction of Three(3) class room ,Govt Higher Primary School (Kannada) in Mangalgi [Including electrification fans, light and plug provisions]19.5006/12/201619.50025/03/201719.500  0.00006/12/201619.50019.310CompletedCompletedSCP24/06/2019 13:46:17
48 BDR1632111452016-17MICROBidarHumnabadBoralSCP InstitutionalSWOthersOthersKRIDLKRIDL HumnabadCEO15/07/2016Construction of One(1) class room ,Govt Higher Primary School (Kannada) Boral [Including electrification fans, light and plug provisions]Construction of One(1) class room ,Govt Higher Primary School (Kannada) Boral [Including electrification fans, light and plug provisions]7.0006/12/20167.00025/03/20177.000  0.00006/12/20167.0006.930CompletedCompleted SCP24/06/2019 13:46:53
49 BDR1632112052016-17MICROBidarHumnabadChitgoppa (TMC)SCP InstitutionalEducationOthersOthersPREDPRED HumnabadCEO29/08/2016 ಮೆಟ್ರಿಕ ಪೂರ್ವ ಬಾಲಕರ ವಸತಿ ನಿಲಯ ಚಿಟಗುಪ್ಪದಲ್ಲಿ 2 ಶೌಚಾಲಯ ಹಾಗೂ 2 ಸ್ನಾನದ ಗೃಹ ನಿರ್ಮಾಣ10.0019/10/201610.00010/11/201610.00021/01/201706/03/20179.77007/03/20179.7709.770CompletedCompleted 14/08/2019 12:46:19
50 BDR1632112062016-17MICROBidarHumnabadHudgiSCP InstitutionalEducationOthersOthersPREDPRED HumnabadCEO29/08/2016 ಮೆಟ್ರಿಕ ಪೂರ್ವ ಬಾಲಕರ ವಸತಿ ನಿಲಯ ಹುಡಗಿಯಲ್ಲಿ 2 ಶೌಚಾಲಯ ಹಾಗೂ 2 ಸ್ನಾನದ ಗೃಹ ನಿರ್ಮಾಣ10.0019/10/201610.00010/11/201610.00024/11/201602/02/20179.06003/02/20179.0609.040CompletedCompleted 16/08/2019 10:05:59
51 BDR1632112072016-17MICROBidarHumnabadHallikhed (B)SCP InstitutionalEducationOthersOthersPREDPRED HumnabadCEO29/08/2016 ಮೆಟ್ರಿಕ ಪೂರ್ವ ಬಾಲಕರ ವಸತಿ ನಿಲಯ ಹಳ್ಳಿಖೇಡ (ಬಿ) 2 ಶೌಚಾಲಯ ಹಾಗೂ 2 ಸ್ನಾನದ ಗೃಹ ನಿರ್ಮಾಣ10.0019/10/201610.00010/11/201610.00021/01/201706/04/20179.86006/04/20179.8609.640CompletedCompleted 14/08/2019 12:46:58
52 BDR1632112082016-17MICROBidarHumnabadDubalgundiSCP InstitutionalEducationOthersOthersPREDPRED HumnabadCEO29/08/2016 ಮೆಟ್ರಿಕ ಪೂರ್ವ ಬಾಲಕರ ವಸತಿ ನಿಲಯ ದುಬಲಗುಂಡಿ (ಪ್ರಸ್ತುತ ವಸತಿ ನಿಲಯದಲ್ಲಿರುವ ಬೋರವೆಲ್ ಅಂತರ್ಜಲ ಮಟ್ಟ ಕುಸಿದಿದ್ದು ನೀರನ ತೊಂದರೆಯಾಗಿರುವ ಪ್ರಯುಕ್ತ)ಹೊಸ ಬೋರವೆಲ್ ಕೋರೆವುದು ಹಾಗೂ ಮೋಟಾರ ಅಳವಡಿಸಿ ಪೈಪ ಲೈನ್ ಮಾಡಿಸುವುದು5.1828/11/20165.18012/12/20165.18021/01/201730/01/20172.61030/01/20172.6102.520CompletedCompleted 14/08/2019 12:47:45
53 BDR1632121492016-17MICROBidarHumnabadNagankeraTSP InstitutionalEducationOthersOthersKRIDLKRIDL HumnabadCEO15/07/2016Construction of One(1) class room ,Govt Higher Primary School (Urdu) Nagankera [Including electrification fans, light and plug provisions]Construction of One(1) class room ,Govt Higher Primary School (Urdu) Nagankera [Including electrification fans, light and plug provisions]7.0006/12/20167.00025/03/20177.000  0.00006/12/20167.0006.930CompletedCompleted TSP24/06/2019 13:49:02
54 BDR1632121502016-17MICROBidarHumnabadUdamnalliTSP InstitutionalWomen & ChildOthersOthersKRIDLKRIDL HumnabadCEO15/07/2016Construction of One Model Aganwadi in (UDABNALLI-1)- UDABNALLI Village [Baby toilet,compound wall,bore well ,electrification,syntex over head tank,water pipeline to kitchen room,and fan and light plug points.]Construction of One Model Aganwadi in (UDABNALLI-1)- UDABNALLI Village [Baby toilet,compound wall,bore well ,electrification,syntex over head tank,water pipeline to kitchen room,and fan and light plug points.]13.7506/12/201613.75025/03/201713.750  0.00006/12/201613.75013.610CompletedCompleted TSP24/06/2019 13:49:45
55 BDR1632122162016-17MICROBidarHumnabadHomnabad (TMC)TSP InstitutionalBCMOthersOthersPREDPRED HumnabadCEO16/08/2016 ಮೆಟ್ರಿಕ ಪೂರ್ವ ಬಾಲಕರ ವಸತಿ ನಿಲಯ ಹುಮನಾಬಾದ ಹೆಚ್ಚುವರಿ ಕೋಣೆಗಳ ನಿರ್ಮಾಣ (Including Electrification,Fan & Light Fitting and Plug provision) 19.9528/11/201619.95005/01/201719.95021/01/201717/03/201717.46018/03/201717.46016.980CompletedCompleted 14/08/2019 12:48:03
56 BDR1632131532016-17MICROBidarHumnabadBemalkhedaGeneralInstitutionalHealthOthersOthersKRIDLKRIDL HumnabadCEO15/07/2016 Staff Nourse Quarters Primary Health Center Bemalakheda Village with TWIN 2BHK [electrification,water supply and sanitiation] Staff Nourse Quarters Primary Health Center Bemalakheda Village with TWIN 2BHK [electrification,water supply and sanitiation]20.0006/12/201620.00025/03/201720.000  0.00006/12/201620.00019.800CompletedCompleted General20/03/2019 13:54:50
57 BDR1632131542016-17MICROBidarHumnabadNirnaGeneralInstitutionalHealthOthersOthersKRIDLKRIDL HumnabadCEO15/07/2016 Staff Nourse Quarters Primary Health Center , NIRNA Village With TWIN 2 BHK [electrification,water supply and sanitiation] Staff Nourse Quarters Primary Health Center , NIRNA Village With TWIN 2 BHK [electrification,water supply and sanitiation]20.0006/12/201620.00025/03/201720.000  0.00006/12/201620.00019.800CompletedCompleted General20/03/2019 13:55:40
58 BDR1632131552016-17MICROBidarHumnabadNirnaGeneralInstitutionalHealthOthersOthersRWSRWS HumnabadCEO15/07/2016Providing Water Facility With Pumping Machinery Cistern And Pipe Line Primary Health Center NIRNAProviding Water Facility With Pumping Machinery Cistern And Pipe Line Primary Health Center NIRNA3.0007/10/20163.00018/10/20163.000  0.00031/12/20162.9301.970Completedಪೂರ್ಣಗೊಂಡಿದೆ. 19/08/2019 19:03:54
59 BDR1632131562016-17MICROBidarHumnabadMannaekhalliGeneralInstitutionalHealthOthersOthersRWSRWS HumnabadCEO15/07/2016Providing Water Facility With Driking Water Purifier ,Community Health Center MANNA-E-KHELLI VILLAGEProviding Water Facility With Driking Water Purifier ,Community Health Center MANNA-E-KHELLI VILLAGE3.0007/10/20163.00018/10/20163.000 10/02/20172.94027/03/20172.9402.480Completed ಪೂರ್ಣಗೊಂಡಿದೆ. 20/03/2019 13:57:17
60 BDR1632131572016-17MICROBidarHumnabadKumarchincholiGeneralInstitutionalEducationOthersOthersPREDPRED HumnabadCEO15/07/2016 ಸರಕಾರಿ ಕಿರಿಯ ಪ್ರಾಥಮಿಕ ಶಾಲೆ ಕು.ಚಿಂಚೋಳಿ ಬಡಾವಣೆ ಶಾಲೆಯಲ್ಲಿ 2 ಕೋಣೆ ನಿರ್ಮಾಣ {Including electrification,fan and light.and plug provision}13.0021/09/201613.00014/11/201613.00024/11/201631/01/201711.87031/01/201711.87011.810CompletedCompleted 16/08/2019 10:06:18
61 BDR1632131582016-17MICROBidarHumnabadMugnoorGeneralInstitutionalEducationOthersOthersPREDPRED HumnabadCEO15/07/2016 Construction of 01 rooms building to govt. school building in LR.PR. school at Mugnoor village in Humanabad tq6.5019/10/201613.00025/11/201613.00015/12/201630/01/201711.59031/01/201711.5905.620CompletedCompleted 16/08/2019 10:06:49
62 BDR1632131592016-17MICROBidarHumnabadOthersGeneralInstitutionalEducationOthersOthersPREDPRED HumnabadCEO15/07/2016 ಸರಕಾರಿ ಕಿರಿಯ ಪ್ರಾಥಮಿಕ ಶಾಲೆ ಚಂದನಹಳ್ಳಿ (ಬಡಾವಣೆ), ಕು.ಚಿಂಚೋಳಿ ಬಡಾವಣೆ, ಲಾಲಧರಿ ತಾಂಡಾ, ಉರ್ದು ಜಲಸಿಂಗಿ ಹಾಗೂ ಸರಕಾರಿ ಹಿರಿಯ ಪ್ರಾಥಮಿಕ ಶಾಲೆ ಚಿನಕೇರಾ ಶಾಲೆಗಳಲ್ಲಿ ಅಡುಗೆ ಕೋಣೆ ನಿರ್ಮಾಣ {Including electrification,fan and light.and plug provision}20.0021/09/201620.00004/11/201620.00024/11/201613/02/201718.90015/02/201718.90015.000CompletedPhysically Completed 16/08/2019 16:18:14
63 BDR1632131642016-17MICROBidarHumnabadPolakpalliGeneralInstitutionalWomen & ChildOthersOthersKRIDLKRIDL HumnabadCEO15/07/2016Construction of One Model Aganwadi in Polakapalli Village with Baby toilet,compound wall,bore well ,electrification,syntex over head tank,water pipeline to kitchen room,and fan and light plug points.Construction of One Model Aganwadi in Polakapalli Village with Baby toilet,compound wall,bore well ,electrification,syntex over head tank,water pipeline to kitchen room,and fan and light plug points.13.7506/12/201613.75025/03/201713.750  0.00006/12/201613.75013.610CompletedCompleted General20/03/2019 14:51:28
64 BDR1632132042016-17MICROBidarHumnabadMannaekhalliGeneralInstitutionalHealthOthersOthersKRIDLKRIDL HumnabadCEO15/07/2016Construction of New Veterinery Dispensary Building at Manna-E-Khelli villageConstruction of New Veterinery Dispensary Building at Manna-E-Khelli village26.9206/12/201626.92025/03/201726.920  0.00006/12/201626.92026.650CompletedCompleted General20/03/2019 14:52:07
65 BDR1632132122016-17MICROBidarHumnabadWalkhandiGeneralInstitutionalEducationOthersOthersPREDPRED HumnabadCEO29/08/2016 ಸರಕಾರಿ ಪ್ರೌಢ ಶಾಲೆ ವಳಖಿಂಡಿ ಗ್ರಾಮದಲ್ಲಿ 02 ಕೋಣೆಗಳ ನಿರ್ಮಾಣ (Including Electrification,Fan & Light Fitting and Plug provision)13.0019/10/201613.00025/11/201613.00015/12/201606/03/201711.84006/03/201711.84010.380CompletedCompleted 16/08/2019 10:07:12
66 BDR1632132132016-17MICROBidarHumnabadChandanalliGeneralInstitutionalEducationOthersOthersPREDPRED HumnabadCEO29/08/2016 ಸರಕಾರಿ ಪ್ರೌಢ ಶಾಲೆ ಚಂದರನಹಳ್ಳಿ ಗ್ರಾಮದಲ್ಲಿ 02 ಕೋಣೆಗಳ ನಿರ್ಮಾಣ (Including Electrification,Fan & Light Fitting and Plug provision)13.0019/10/201613.00025/11/201613.00015/12/201614/02/201712.90015/02/201712.90012.900CompletedCompleted 16/08/2019 10:07:44
67 BDR1632132142016-17MICROBidarHumnabadChitgoppa (TMC)GeneralInstitutionalEducationOthersOthersPREDPRED HumnabadCEO29/08/2016 ಸರಕಾರಿ ಪ್ರೌಢ ಶಾಲೆ ಚಿಟಗುಪ್ಪಾ ಪಟ್ಟಣದಲ್ಲಿ 02 ಕೋಣೆಗಳ ನಿರ್ಮಾಣ (Including Electrification,Fan & Light Fitting and Plug provision)13.0019/10/201613.00025/11/201613.00015/12/201602/02/201712.99002/02/201712.99012.920CompletedCompleted 16/08/2019 10:08:01
68 BDR1632132412016-17MICROBidarHumnabadHandikheraGeneralInstitutionalEducationOthersOthersPREDPRED HumnabadCEO30/12/2017 ಹಂದಿಕೇರಾ ಗ್ರಾಮದ ಸರ್ಕಾರಿ ಕಿರಿಯ ಪ್ರಾಥಮಿಕ ಶಾಲೆ ವರ್ಗ ಕೋಣೆ ನಿರ್ಮಾಣ.6.5006/03/20186.50026/07/20186.50004/08/201820/09/20186.24020/09/20186.2406.210CompletedPhysically Completed 20/03/2019 14:55:30
69 BDR1632211662016-17MICROBidarHumnabadOthersSCP InfrastructureRoads & BridgesOthersOthersPMGSYPMGSY BidarCEO15/07/2016 ಘಾಟಬೋರಳ ದಿಂದ ಬಸವಕಲ್ಯಾಣ ತಾಲೂಕು ಗಡಿವರೆಗೆ ರಸ್ತೆ ನಿರ್ಮಾಣ95.4021/09/201695.40007/01/201795.40003/02/201710/05/201786.70014/06/201786.70082.410Completedphysically completedphysically completed & financially in progress06/03/2019 12:57:45
70 BDR1632211672016-17MICROBidarHumnabadOthersSCP InfrastructureRoads & BridgesOthersOthersPMGSYPMGSY BidarCEO15/07/2016 ರಾಂಪೂರ ದಿಂದ ಇಟಗಾ ರಸ್ತೆ ನಿರ್ಮಾಣ30.0021/09/201630.00003/11/201630.00003/02/201710/05/201727.96014/06/201727.96020.670Completedphysically completedphysically completed & financially in progress06/03/2019 12:57:45
71 BDR1632211682016-17MICROBidarHumnabadOthersSCP InfrastructureRoads & BridgesOthersOthersPWDPWD HumnabadDC15/07/2016Improvements to Approch Road to Devgiri thanda From SH15 (Blance Length) in Humnabad Taluka (2.2km) Improvements to Approch Road to Devgiri thanda From SH15 (Blance Length) in Humnabad Taluka (2.2km) 64.0314/10/201664.03024/11/201664.03007/12/201627/01/201751.74006/02/201751.74049.640Completedcompleted 19/06/2019 13:29:57
72 BDR1632211692016-17MICROBidarHumnabadOthersSCP InfrastructureWater SupplyOthersOthersPREDPRED HumnabadCEO15/07/2016 ಹುಡಗಿ ಗ್ರಾಮದ ಇಂದಿರಾನಗರ ಎಸ್.ಸಿ ಓಣಿಯಲ್ಲಿ ಸಿ.ಸಿ ರಸ್ತೆ ಮತ್ತು ಚರಂಡಿ20.0028/11/201620.00027/12/201620.00021/01/201724/02/201719.64024/02/201719.64018.820CompletedCompleted 14/08/2019 12:48:51
73 BDR1632211712016-17MICROBidarHumnabadOthersSCP InfrastructureWater SupplyOthersOthersRWSRWS HumnabadCEO15/07/2016Providing augmentation to MWS Scheme Extension area Hudgi (Ramnagar)Providing augmentation to MWS Scheme Extension area Hudgi (Ramnagar)11.3521/09/201611.35026/11/201611.350 21/02/20178.36014/03/20177.2005.640Completed ಪೂರ್ಣಗೊಂಡಿದೆ. 06/03/2019 12:57:49
74 BDR1632221722016-17MICROBidarHumnabadOthersTSP InfrastructureRoads & BridgesOthersOthersPWDPWD HumnabadDC15/07/2016 ಹುಮನಾಬಾದ ಪಟ್ಟಣದ ಎನ್.ಹೆಚ್ 9 ದಿಂದ ಶಿವಪೂರ ಜಂಕ್ಷನ್ ವರೆಗೆ (ವಾಯಾ, ಸಾಯಿ ಚಿತ್ರ ಮಂದಿರ) ರಸ್ತೆ ನಿರ್ಮಾಣ. 20.0014/10/201620.00007/12/201620.00012/12/201626/12/201618.09006/01/201718.09018.070CompletedCompleted, 20/06/2019 11:59:02
75 BDR1632221732016-17MICROBidarHumnabadOthersTSP InfrastructureRoads & BridgesOthersOthersPWDPWD HumnabadDC15/07/2016Improvements to Approch Road to Nagankera From NH-9 -Nirna Basantpur MDR (Blance Length) in Humnabad Taluka (1.1km) Improvements to Approch Road to Nagankera From NH-9 -Nirna Basantpur MDR (Blance Length) in Humnabad Taluka (1.1km) 47.8414/10/201647.84024/11/201647.84007/12/201624/12/201641.08006/01/201741.08038.440CompletedCompleted 20/06/2019 11:59:41
76 BDR1632221742016-17MICROBidarHumnabadOthersTSP InfrastructureRoads & BridgesOthersOthersPMGSYPMGSY BidarCEO15/07/2016 ರಾಜ್ಯ ಹೆದ್ದಾರಿ-75 ರಿಂದ ರಾಂಪೂರ ವಾಯಾ, ಮುದನಾಳ ರಸ್ತೆ ನಿರ್ಮಾಣ ಕಿ.ಮೀ. 0.00 ರಿಂದ 1.4026.7121/09/201626.71003/11/201626.71003/02/201710/05/201723.53014/06/201723.53023.360Completedphysically completed physically completed & financially in progress06/03/2019 12:57:45
77 BDR1632221752016-17MICROBidarHumnabadOthersTSP InfrastructureRoads & BridgesOthersOthersPMGSYPMGSY BidarCEO15/07/2016 ರಾಜ್ಯ ಹೆದ್ದಾರಿ-75 ರಿಂದ ಕೂಡಂಬಲ್ ಗ್ರಾಮಕ್ಕೆ ಕೂಡು ರಸ್ತೆ ನಿರ್ಮಾಣ 22.0021/09/201622.00003/11/201622.00003/02/201710/05/201719.46014/06/201719.46012.470Completed completedPhysically completed & Financial in progress06/03/2019 12:57:45
78 BDR1632221762016-17MICROBidarHumnabadOthersTSP InfrastructureRoads & BridgesOthersOthersPREDPRED HumnabadCEO15/07/2016 ಹುನ್ನಳ್ಳಿ-ಸಿಂದಬಂದಗಿ ಜಿಲ್ಲಾ ಮುಖ್ಯ ರಸ್ತೆಯ ಕಿ.ಮೀ 6.00 ರಿಂದ 6.40 ವರೆಗೆ ಸಿ.ಸಿ.ಚರಂಡಿ ಹಾಗೂ ರಸ್ತೆ ನಿರ್ಮಾಣ.25.0021/09/201625.00004/11/201625.00015/12/201630/01/201722.13031/01/201722.13021.760CompletedCompleted 16/08/2019 10:08:42
79 BDR1632221772016-17MICROBidarHumnabadOthersTSP InfrastructureWater SupplyOthersOthersRWSRWS HumnabadCEO15/07/2016Providing augmentation to MWS Scheme Extension area kankatta Providing augmentation to MWS Scheme Extension area kankatta 8.0007/10/20168.00018/10/20168.000 05/01/20177.09003/02/20176.5105.130Completedಪೂರ್ಣಗೊಂಡಿದೆಪೂರ್ಣಗೊಂಡಿದೆ06/03/2019 12:57:49
80 BDR1632221782016-17MICROBidarHumnabadOthersTSP InfrastructureWater SupplyOthersOthersRWSRWS HumnabadCEO15/07/2016Providing OHT and rising main pipeline kabirabad wadiProviding OHT and rising main pipeline kabirabad wadi15.4321/09/201615.43026/11/201615.430 21/02/201715.30014/03/201715.01014.080Completed ಪೂರ್ಣಗೊಂಡಿದೆ. 06/03/2019 12:57:49
81 BDR1632231792016-17MICROBidarHumnabadHallikhed (B)GeneralInfrastructureRoads & BridgesOthersOthersPWDPWD HumnabadDC15/07/2016 ಹಳ್ಳೀಖೇಡ (ಬಿ) ಗ್ರಾಮದ ಬಸವೇಶ್ವರ ವೃತ್ತದಿಂದ ಆರ್ಯಸಮಾಜ ಭವನದವರೆಗೆ ಸಿ.ಸಿ.ರಸ್ತೆ ಹಾಗೂ ಚರಂಡಿ ನಿರ್ಮಾಣ.70.0014/10/201670.00022/11/201670.00007/12/201608/02/201762.00027/02/201762.00059.840Completedcompleted 20/06/2019 12:00:19
82 BDR1632231802016-17MICROBidarHumnabadHallikhed (B)GeneralInfrastructureRoads & BridgesOthersOthersPWDPWD HumnabadDC15/07/2016 ರಾಜ್ಯ ಹೆದ್ದಾರಿ-50 ರಿಂದ ಹಳ್ಳಿಖೇಡ (ಬಿ) ಗ್ರಾಮಕ್ಕೆ ಕೂಡು ರಸ್ತೆ ನಿರ್ಮಾಣ96.0014/10/201696.00030/11/201696.00007/12/201601/03/201784.52009/03/201784.52081.340CompletedCompleted  20/06/2019 12:00:50
83 BDR1632231812016-17MICROBidarHumnabadHallikhed (B)GeneralInfrastructureRoads & BridgesOthersOthersPWDPWD HumnabadDC15/07/2016 ಹುಮನಾಬಾದ ಪಟ್ಟಣದ ಸೂಪರ್ ಫಂಕ್ಷನ್ ಹಾಲ್ ದಿಂದ ನೀಲಮ್ಮಾ ಮನೆಯವರೆಗೆ ಸಿ.ಸಿ.ರಸ್ತೆ ನುರ್ಮಾಣ20.0014/10/201620.00017/11/201620.00007/12/201623/12/201617.25006/01/201717.25015.850CompletedCompleted 20/06/2019 12:01:21
84 BDR1632231822016-17MICROBidarHumnabadHomnabad (TMC)GeneralInfrastructureRoads & BridgesOthersOthersPWDPWD HumnabadDC15/07/2016 ಹುಮನಾಬಾದ ಪಟ್ಟಣದ ಟೀಚರ್ಸ ಕಾಲೋನಿಯಲ್ಲಿ ಸಿ.ಸಿ.ರಸ್ತೆ ನಿರ್ಮಾಣ10.0014/10/201610.00004/11/201610.00010/11/201608/12/20169.98016/12/20169.1408.960CompletedCompleted 20/06/2019 12:02:21
85 BDR1632231832016-17MICROBidarHumnabadAlluraGeneralInfrastructureRoads & BridgesOthersOthersPMGSYPMGSY BidarCEO15/07/2016 ಅಲ್ಲೂರ ದಿಂದ ಮದರಗಾಂವ ವರೆಗೆ ರಸ್ತೆ ಡಾಂಬರೀಕರಣ (ಕಿ.ಮೀ0.00 ರಿಂದ 3.30)40.0021/09/201640.00003/11/201640.00006/03/201719/05/201743.47006/09/201743.47040.570Completedcompleted  20/03/2019 15:05:01
86 BDR1632231842016-17MICROBidarHumnabadMadargaonGeneralInfrastructureRoads & BridgesOthersOthersPMGSYPMGSY BidarCEO15/07/2016 ಮದರಗಾಂವ ದಿಂದ ಮಲ್ಕಾಪೂರ ವಾಡಿ ವರೆಗೆ ರಸ್ತೆ ನಿರ್ಮಾಣ (ಕಿ.ಮೀ0.00 ರಿಂದ1.00)30.0021/09/201630.00003/11/201630.00006/03/201719/05/201732.62006/09/201732.62031.980Completed completed 20/03/2019 15:05:30
87 BDR1632231852016-17MICROBidarHumnabadHudgiGeneralInfrastructureRoads & BridgesOthersOthersPMGSYPMGSY BidarCEO15/07/2016 ಹುಡಗಿ ದಿಂದ ಸಿಂಧನಕೇರಾ ವರೆಗೆ ರಸ್ತೆ ಡಾಂಬರೀಕರಣ (ಕಿ.ಮೀ0.00 ರಿಂದ 2.40)30.0013/10/201630.00003/11/201630.00006/03/201719/05/201732.56006/09/201732.56032.000Completed Completed 20/03/2019 15:06:03
88 BDR1632231862016-17MICROBidarHumnabadSitalgeraGeneralInfrastructureRoads & BridgesOthersOthersPMGSYPMGSY BidarCEO15/07/2016 ರಾ.ಹೆ. 150- ಎನ್.ಹೆಚ್-9 (ಎಮ್.ಡಿ.ಆರ್) ದಿಂದ ಸಿತಾಳಗೇರಾ ವರೆಗೆ ರಸ್ತೆ ಸುಧಾರಣೆ25.0013/10/201625.00003/11/201625.00006/03/201719/05/201726.82006/09/201726.82023.960Completed completed 20/03/2019 15:07:05
89 BDR1632231872016-17MICROBidarHumnabadDubalgundiGeneralInfrastructureRoads & BridgesOthersOthersPMGSYPMGSY BidarCEO15/07/2016 ದುಬಲಗುಂಡಿ ದಿಂದ ಹುಣಸಗೇರಾ ವಾಯಾ, ಸೋನಕೇರಾ ರಸ್ತೆ ನಿರ್ಮಾಣ100.0013/10/2016100.00004/01/2017100.00006/03/201719/05/2017108.19006/09/2017108.190107.610Completedcompleted  20/03/2019 15:07:48
90 BDR1632231882016-17MICROBidarHumnabadBemalkhedaGeneralInfrastructureRoads & BridgesOthersOthersPMGSYPMGSY BidarCEO15/07/2016Improvements of Road Bemalkheda to Telengana Border in humanabad Taluka (2.5 Km)Improvements of Road Bemalkheda to Telengana Border in humanabad Taluka (2.5 Km)100.0013/10/2016100.00004/01/2017100.00006/03/201719/05/2017105.56006/09/2017105.560103.170Completed completed 20/03/2019 15:14:18
91 BDR1632231892016-17MICROBidarHumnabadMannaekhalliGeneralInfrastructureRoads & BridgesOthersOthersPMGSYPMGSY BidarCEO15/07/2016Improvements to Road From Manna-E-Kheeli to NH-9-Nirna-Basantpur MDRA humanabad Taluka (2.00 Km)Improvements to Road From Manna-E-Kheeli to NH-9-Nirna-Basantpur MDRA humanabad Taluka (2.00 Km)80.0013/10/201680.00004/01/201780.00006/03/201719/05/201786.43006/09/201786.43083.650Completedcompleted 20/03/2019 15:14:47
92 BDR1632231902016-17MICROBidarHumnabadNirnaGeneralInfrastructureRoads & BridgesOthersOthersPREDPRED HumnabadCEO15/07/2016 Construction of CC Road And Drain from Basveshawar Circle to SBH Bank, lachangar house to Kumbar Ayyappa house, Khatkur Galli to Ashok kirana House, Sargar Babu house To Khasempure shop & Milk dairy society to PKPS in NIRNA Village, HUMNABAD Taluka Construction of CC Road And Drain from Basveshawar Circle to SBH Bank, lachangar house to Kumbar Ayyappa house, Khatkur Galli to Ashok kirana House, Sargar Babu house To Khasempure shop & Milk dairy society to PKPS in NIRNA Village, HUMNABAD Taluka20.0021/09/201620.00004/11/201620.00021/01/201717/03/201718.13018/03/201718.13016.570CompletedCompleted 14/08/2019 12:50:26
93 BDR1632231912016-17MICROBidarHumnabadDhumansoorGeneralInfrastructureRoads & BridgesOthersOthersPREDPRED HumnabadCEO15/07/2016 ಧುಮ್ಮನಸೂರ ಗ್ರಾಮದ ಬಾಬುರಾವ ಬುರ್ಕಿ ಮನೆಯಿಂದ ಹನುಮಾನ ಮಂದಿರವರೆಗೆ ಸಿ.ಸಿ ರಸ್ತೆ ನಿರ್ಮಾಣ.10.5221/09/201610.50004/11/201610.52015/12/201606/03/20179.09007/03/20179.0909.090CompletedCompleted 16/08/2019 10:10:45
94 BDR1632231922016-17MICROBidarHumnabadUdbalGeneralInfrastructureRoads & BridgesOthersOthersPREDPRED HumnabadCEO15/07/2016 Construction of CC Road And Drain from Chitaguppa Road to Basaweshawar Circle, Basaveshwar circle to Nirna-Udbal road, Paramma house to Kallappa Solpur house & Kallappa Solpur house to Nala in UDBAL Village, HUMNABAD Taluka Construction of CC Road And Drain from Chitaguppa Road to Basaweshawar Circle, Basaveshwar circle to Nirna-Udbal road, Paramma house to Kallappa Solpur house & Kallappa Solpur house to Nala in UDBAL Village, HUMNABAD Taluka17.2521/09/201617.25004/11/201617.25021/01/201722/03/201716.52022/03/201716.52014.990CompletedCompleted 14/08/2019 12:52:31
95 BDR1632231932016-17MICROBidarHumnabadMustariGeneralInfrastructureWater SupplyOthersOthersPREDPRED HumnabadCEO15/07/2016 ಮುಸ್ತರಿ ಗ್ರಾಮದ ಮುಖ್ಯ ರಸ್ತೆಯಿಂದ ನಾಗಶೆಟ್ಟಿ ತಂಗಾ ಅಂಗಡಿ ವರೆಗೆ ಸಿ.ಸಿ ರಸ್ತೆ ಮತ್ತು ಚರಂಡಿ ನಿರ್ಮಾಣ15.3828/11/201615.38027/12/201615.38021/01/201724/03/201713.20024/03/201713.20013.170CompletedCompleted  14/08/2019 12:53:17
96 BDR1632231942016-17MICROBidarHumnabadSitalgeraGeneralInfrastructureWater SupplyOthersOthersRWSRWS HumnabadCEO15/07/2016Providing augmentation to MWS Scheme SitalgeraProviding augmentation to MWS Scheme Sitalgera10.0021/09/201610.00018/10/201610.000 21/12/20168.69005/01/20178.4206.410Completedಪೂರ್ಣಗೊಂಡಿದೆ. 20/03/2019 15:18:27
97 BDR1632231952016-17MICROBidarHumnabadBorampalliGeneralInfrastructureWater SupplyOthersOthersRWSRWS HumnabadCEO15/07/2016Providing augmentation to PWS Scheme BorampalliProviding augmentation to PWS Scheme Borampalli15.0007/10/201615.00026/11/201615.000 22/02/201712.39020/03/201711.0809.850CompletedPhysically CompletedPhysically Completed20/03/2019 15:19:05
98 BDR1632231962016-17MICROBidarHumnabadHandikheraGeneralInfrastructureWater SupplyOthersOthersRWSRWS HumnabadCEO15/07/2016Providing MWS Scheme HandikeraProviding MWS Scheme Handikera10.0007/10/201610.00018/10/201610.000 05/01/20177.98010/01/20177.2106.890Completed ಪೂರ್ಣಗೊಂಡಿದೆ. ಪೂರ್ಣಗೊಂಡಿದೆ.20/03/2019 15:19:52
99 BDR1632231972016-17MICROBidarHumnabadGhodwadiGeneralInfrastructureWater SupplyOthersOthersRWSRWS HumnabadCEO15/07/2016Providing augmentation to PWS Scheme GhodwadiProviding augmentation to PWS Scheme Ghodwadi15.0007/10/201615.00026/11/201615.000 22/02/201712.40020/03/201710.7709.130Completedಪೂರ್ಣಗೊಂಡಿದೆ.ಪೂರ್ಣಗೊಂಡಿದೆ.20/03/2019 15:20:20
100 BDR1632231982016-17MICROBidarHumnabadGhatboralGeneralInfrastructureWater SupplyOthersOthersRWSRWS HumnabadCEO15/07/2016Providing augmentation to PWS Scheme GhatboralProviding augmentation to PWS Scheme Ghatboral15.0007/10/201615.00026/11/201615.000 22/02/201714.91020/03/201713.42013.290Completedಪೂರ್ಣಗೊಂಡಿದೆ.ಪೂರ್ಣಗೊಂಡಿದೆ. 20/03/2019 15:20:58
101 BDR1632231992016-17MICROBidarHumnabadHallikhed (B)GeneralInfrastructureWater SupplyOthersOthersRWSRWS HumnabadCEO15/07/2016Providing augmentation to MWS Scheme near BSSK Hallikhed(B)Providing augmentation to MWS Scheme near BSSK Hallikhed(B)10.0021/09/201610.00018/10/201610.000 21/12/20169.73009/01/20178.1707.140Completed ಪೂರ್ಣಗೊಂಡಿದೆ. ಪೂರ್ಣಗೊಂಡಿದೆ.20/03/2019 15:21:45
102 BDR1632232002016-17MICROBidarHumnabadManiknagarGeneralInfrastructureWater SupplyOthersOthersRWSRWS HumnabadCEO15/07/2016Providing rising main pipe line and Pumpset ManiknagarProviding rising main pipe line and Pumpset Maniknagar10.0007/10/201610.00018/10/201610.000 09/01/20179.94024/01/20178.5208.510Completedಪೂರ್ಣಗೊಂಡಿದೆ. ಪೂರ್ಣಗೊಂಡಿದೆ. 20/03/2019 15:22:27
103 BDR1642131222016-17MICROBidarBidarBidar (CMC + OG)GeneralInstitutionalEducationOthersOthersPWDPWD BidarDC15/07/2016 ಬೀದರ ಪಟ್ಟಣದ ಮುಸ್ತಾಯಿಪುರ ಸರಕಾರಿ ಪ್ರೌಢ ಶಾಲೆಗೆ ಎರಡು ಕೋಣೆಗಳ ನಿರ್ಮಾಣ. .{Including electrification,fan and light.and plug provision}13.0014/10/201613.00026/11/201613.00007/12/201623/12/201611.38006/01/201711.3808.920CompletedCompleted 20/06/2019 12:02:49
104 BDR1642211262016-17MICROBidarBidarOthersSCP InfrastructureRoads & BridgesOthersOthersCMC DC15/07/2016 ಬೀದರ ಪಟ್ಟಣ ಆನಂದ ನಗರದ ರವಿ ಕಿರಾಣಾ ಅಂಗಡಿಯಿಂದ ವಿನೋದ ಮನೆವರೆಗೆ ಸಿ.ಸಿ ರಸ್ತೆ ನಿರ್ಮಾಣ ಹಾಗೂ ಬಾಬುರಾವ ಮನೆಯಿಂದ ಜನವಾಡಕರ ಮನೆವರೆಗೆ ಚರಂಡಿ ನಿರ್ಮಾಣ ಹಾಗೂ ಇಂದು ಎಮಂ. ನಿವಾಸದಿಂದ ದೀನೆ ನಿವಾಸವರೆಗೆ ಸಿ.ಸಿ.ರಸ್ತೆ ನಿರ್ಮಾಣ.20.0022/11/201620.00011/12/201620.00003/01/201730/03/20170.00011/04/201719.61019.890CompletedWork Completed 10/05/2019 10:58:58
105 BDR1642211272016-17MICROBidarBidarOthersSCP InfrastructureRoads & BridgesOthersOthersCMC DC15/07/2016 ಬೀದರ ಪಟ್ಟಣದ ಕುಂಬಾರವಾರ್ಡದ ಹನುಮಾನ ಮಂದಿರದಿಂದ ಬಾಬುರಾವ ಡಾವಣಗಾಂವ ಮನೆವರೆಗೆ ಹಾಗೂ ಮೈಲೂರ ಕಾಲೋನಿಯ ಶ್ರಾವಣ ಮನೆಯಿಂದ ಸಿದ್ದಪ್ಪಾ ಮನೆಯವರೆಗೆ ಸಿ.ಸಿ.ರಸ್ತೆ ಹಾಗೂ ಚರಂಡಿ ನಿರ್ಮಾಣ.34.1322/11/201634.13011/12/201634.13003/01/201730/03/20170.00006/04/201732.10032.080Completedwork completed  10/05/2019 11:00:29
106 BDR1642211282016-17MICROBidarBidarOthersSCP InfrastructureRoads & BridgesOthersOthersPREDPRED BhalkiCEO15/07/2016CONSTRUCTION OF CC ROAD AND DRAIN From Under pass bridge (Entrance to Village) to Govt. Kannada School in HOKRANA (K) Village, BIDAR Taluka (Approach Road)CONSTRUCTION OF CC ROAD AND DRAIN From Under pass bridge (Entrance to Village) to Govt. Kannada School in HOKRANA (K) Village, BIDAR Taluka (Approach Road)23.1821/09/201623.18004/11/201623.18021/01/201731/03/201719.60031/03/201719.60017.050CompletedPhysically Completed 14/08/2019 12:55:06
107 BDR1642211292016-17MICROBidarBidarOthersSCP InfrastructureRoads & BridgesOthersOthersPREDPRED BhalkiCEO15/07/2016CONSTRUCTION OF CC ROAD AND DRAIN from Panchayat Building to Hanuman temple at NAGOORA Village, BIDAR Taluka CONSTRUCTION OF CC ROAD AND DRAIN from Panchayat Building to Hanuman temple at NAGOORA Village, BIDAR Taluka 10.0017/10/201610.00010/11/201610.00021/01/201722/03/20178.97022/03/20178.9708.940CompletedCompleted 14/08/2019 12:55:25
108 BDR1642221302016-17MICROBidarBidarOthersTSP InfrastructureRoads & BridgesOthersOthersCMC DC15/07/2016 ಬೀದರ ಪಟ್ಟಣದ ಲುಂಬುನಿ ನಗರದ ನೌಬಾದ ಮುಖ್ಯ ರಸ್ತೆಯಿಂದ ರಾಮಚಂದ್ರ ನಗರ ರಸ್ತೆವರೆಗೆ ಹಾಗೂ ಮಾಲಗೊಂಡ ಕಾಲೋನಿಯ ವಿ.ಆರ್.ಎಲ್. ಎದುರುಗಡೆಯಿಂದ ( ವಾಯಾಹನುಮಾನ ಮಂದಿರ) ರಮೇಶ ಆಯಾಸಪೂರ ಮನೆವರೆಗೆ ಹಾಗೂ ವಿಜಯ ನಗರ ಕಾಲೋನಿಯ ಲಕ್ಷ್ಮಣ ಮನೆಯಿಂದ ರಾಜಶೇಖರ ಮನೆಯವರೆಗೆ ಸಿ.ಸಿ ರಸ್ತೆ ಹಾಗೂ ಚರಂಡಿ ನಿರ್ಮಾಣ. 34.4522/11/201634.45011/12/201634.45003/01/201730/03/20170.00006/04/201733.02031.580CompletedWork Completed 10/05/2019 11:00:56
109 BDR1642221312016-17MICROBidarBidarOthersTSP InfrastructureRoads & BridgesOthersOthersPREDPRED BhalkiCEO15/07/2016CONSTRUCTION OF CC ROAD AND DRAIN from Shamrao Hamma House to Gundappa Kamthana House , Shamrao Kote House to Dilip Bawge House, Isamil House to Moulana House, Khutub House to Anganwadi, Layak ali hotel to Asur khan of Block No:4,5,6 in BAGDAL Village, BIDAR TalukaCONSTRUCTION OF CC ROAD AND DRAIN from Shamrao Hamma House to Gundappa Kamthana House , Shamrao Kote House to Dilip Bawge House, Isamil House to Moulana House, Khutub House to Anganwadi, Layak ali hotel to Asur khan of Block No:4,5,6 in BAGDAL Village, BIDAR Taluka21.1221/09/201621.12004/11/201621.12021/01/201731/03/201718.94031/03/201718.94018.620CompletedCompleted 14/08/2019 12:55:57
110 BDR1642231322016-17MICROBidarBidarOthersGeneralInfrastructureRoads & BridgesOthersOthersCMC DC15/07/2016 ಬೀದರ ಪಟ್ಟಣದ ವಾರ್ಡ ನಂ:23, 24 & 34 ರ ಗರೀಬ ಕಾಲೋನಿಯ ಖಾಸಿಂ ಮನೆಯಿಂದ ಪುಂಡಲಿಕ ಸೆಂಟರಿಂಗ್ ವಾಯ ಕಲ್ಲಪ್ಪಾ ಮನೆಯವರೆಗೆ ಹಾಗೂ ಅನೀಲಕುಮಾರ ಮನೆಯಿಂದ ತಿಪ್ಪಣ್ಣಾ ಮನೆಯವರೆಗೆ ಹಾಗೂ ಚಿದ್ರಿ ಕಾಲೋನಿಯ ಸುಂದ್ರಮ್ಮಾ ಹಾಲಹಳ್ಳೆ ಮೆನೆಯಿಂದ ಬಾಬು ಏರಫೊರ್ಸ ಮನೆಯವರೆಗೆ ಹಾಗೂ ಮಕದುಮಜಿ ಕಾಲೋನಿಯ ಲಕ್ಕಿ ಟ್ರೇಡರ್ಸ್ ಮನೆಯಿಂದ ಮುದಾಸೀರ ಖಾನ ಮನೆಯವರೆಗೆ ಸಿ.ಸಿ.ರಸ್ತೆ ನಿರ್ಮಾಣ60.0322/11/201660.03011/12/201660.03003/01/201730/03/20170.00006/04/201756.52049.710CompletedCompleted 10/05/2019 11:08:29
111 BDR1642231332016-17MICROBidarBidarBidar (CMC + OG) WARD NO.-0016GeneralInfrastructureRoads & BridgesOthersOthersCMC DC15/07/2016 ಬೀದರ ಪಟ್ಟಣದ ವಾರ್ಡ ನಂ: 16 ರ ದೇವಿ ಕಾಲೋನಿ ಡೇಜೋಡೆ ಮನೆಯಿಂದ ರಮೇಶ ಪಾಂಡೆ ಮನೆಯವರೆಗೆ ಸಿ.ಸಿ.ರಸ್ತೆ ನಿರ್ಮಾಣ.20.0022/11/201620.00011/12/201620.00003/01/201730/03/20170.00006/04/201718.82020.750CompletedWork Completed 10/05/2019 11:09:05
112 BDR1642231342016-17MICROBidarBidarBidar (CMC + OG) WARD NO.-0016GeneralInfrastructureRoads & BridgesOthersOthersCMC DC15/07/2016 ಬೀದರ ಪಟ್ಟಣದ ವಾರ್ಡ ನಂ: 16 ರ ಹೌಸಿಂಗ ಬೋರ್ಡ ಕಾಲೋನಿಯ ಚಿಮಕೋಡೆ ಮನೆಯಿಂದ ಬಂಡೆಪ್ಪಾ ಕಿರಾಣಾ ಮನೆಯವರೆಗೆ ಸಿ.ಸಿ.ರಸ್ತೆ ನಿರ್ಮಾಣ.20.0022/11/201620.00011/12/201620.00003/01/201730/03/20170.00006/04/201718.82016.730CompletedWork Completed 10/05/2019 11:09:36
113 BDR1642231352016-17MICROBidarBidarBidar (CMC + OG) WARD NO.-0025GeneralInfrastructureRoads & BridgesOthersOthersCMC DC15/07/2016 ಬೀದರ ಪಟ್ಟಣದ ವಾರ್ಡ ನಂ: 25 ರ ಬಿಲಾಲ ಕಾಲೋನಿ ಮುಖ್ಯ ರಸ್ತೆಯಿಂದ ಜಾಸ್ಮಿನ ಕಾಲೇಜ ವರೆಗೆ ಸಿ.ಸಿ.ರಸ್ತೆ ನಿರ್ಮಾಣ20.0022/11/201620.00011/12/201620.00003/01/201730/03/20170.00006/04/201718.80018.750CompletedWork Completed 10/05/2019 11:10:02
114 BDR1642231362016-17MICROBidarBidarBidar (CMC + OG) WARD NO.-0025GeneralInfrastructureRoads & BridgesOthersOthersCMC DC15/07/2016 ಬೀದರ ಪಟ್ಟಣದ ವಾರ್ಡ ನಂ: 25 ರ ಬಿಲಾಲ ಕಾಲೋನಿಯ ತಾಜು ಮೆನೆಯಿಂದ ಖಾಲೀದ ಮನೆ ವಾಯಾ ಪಂಪ್ ಹೌಸ್ ವರೆಗೆ ಸಿ.ಸಿ.ರಸ್ತೆ ನಿರ್ಮಾಣ20.0022/11/201620.00011/12/201620.00003/01/201730/03/20170.00006/04/201718.80018.750CompletedWork Completed 10/05/2019 11:10:39
115 BDR1642231372016-17MICROBidarBidarBidar (CMC + OG) WARD NO.-0032GeneralInfrastructureRoads & BridgesOthersOthersCMC DC15/07/2016 ಬೀದರ ಪಟ್ಟಣದ ವಾರ್ಡ ನಂ: 32ರ ಜೇರುಸಲೇಮ ಕಾಲೋನಿಯ ಕುಮಾರ ಮನೆಯಿಂದ ನಂದು ಸ್ವಾಮಿ ಮನೆಯವರೆಗೆ ಸಿ.ಸಿ.ರಸ್ತೆ ನಿರ್ಮಾಣ.16.0022/11/201616.00011/12/201616.00003/03/201730/03/20170.00006/04/201715.05016.050Completedwork completed 10/05/2019 11:00:02
116 BDR1642231382016-17MICROBidarBidarBidar (CMC + OG) WARD NO.-0024GeneralInfrastructureRoads & BridgesOthersOthersCMC DC15/07/2016 ಬೀದರ ಪಟ್ಟಣದ ವಾರ್ಡ ನಂ:24 ರ ಸಿದ್ರಾಮಯ್ಯಾ ಬಡಾವಣೆಯ ಚಿದ್ರಿ ರಿಂಗ್ ರೋಡ ದಿಂದ ಮುಜೀಬ ಮನೆಯವರೆಗೆ (ವಾಯ ಶಾಹಿನ ಕಾಜೇನ) ಸಿ.ಸಿ.ರಸ್ತೆ ನಿರ್ಮಾಣ16.0022/11/201616.00011/12/201616.00003/01/201730/03/201715.05006/04/201715.05013.980CompletedWORK COMPLETED 10/05/2019 10:59:33
117 BDR1642231392016-17MICROBidarBidarBagdalGeneralInfrastructureRoads & BridgesOthersOthersPREDPRED BhalkiCEO15/07/2016CONSTRUCTION OF BT/CC ROAD AND DRAIN from Marigemma Temple to PKPS in Block no.1 and Mainoddin house to Mahebub house in Block no.1, Naseer Jeneral Store to Pasha Flour mill in Block 2 & 3, Narsing house to Miraz vegitable shop in Block 2 & 3, Goswamy Subhash house to Alimoddin Bank in Block 4&5, Ibrahim Syed ali house to Hair Prize Shop in Block 5, Eshappa house to Erappa house in Block 2, Abdul Latif house to Abdul Khan house in Block 3, Shankreppa Hudagi house to Bangla Sultan in Block 3, Asur khan to Gulam sab Kirana Shop in Block 4, Chinumiya house to Akram house in Block 4, Nisar Ahemmed house to Jabber Papad in Block 3&4, Urdu School to Zameer Sunar house in Block 3&4, Naseer Tower to Mahebub Mosen house in Block 1, Muneer Tambuli house to Dastagir Khuran in Block 1, Usman ali house TO Sharif Khureshi house in Block 1& 2, Abdul Zalil house to Mustak Husain havaladar (Near Darga)in Block 1, Khayum house to Mousque in Block 1, Phozaz ali house to Khaser Pasha house in Block 1, BT Road to Police Station in Block 7, Babumiya mouli house to Husain sab house in Block 5, Basavanappa house to Kashinath Dhanur house in Block 5, Maruti Gorgi house to Channappa Andoor house in Block 5, Margemma Temple to PKPS in Block no.1, Gram Panchayath to Dilip Bawagi house in Block 4&5, Old ING Vysya Bank building to Sharfuddin tadpalli house in Block 2&3, Bituminous Road from Police Station to Urdu school (Main Road) in Block 2,3,5, Bituminous Road from Bus stand to State highway via PHC & darga, Gram Panchayath to Dilip Bawagi in Block 4&5, Malshetty Poshetty house to graveyard in Block 6, and Fhakroddin Arbaj ali house to Vikram house in Block 7 in BAGDAL Village, BIDAR TalukaCONSTRUCTION OF BT/CC ROAD AND DRAIN from Marigemma Temple to PKPS in Block no.1 and Mainoddin house to Mahebub house in Block no.1, Naseer Jeneral Store to Pasha Flour mill in Block 2 & 3, Narsing house to Miraz vegitable shop in Block 2 & 3, Goswamy Subhash house to Alimoddin Bank in Block 4&5, Ibrahim Syed ali house to Hair Prize Shop in Block 5, Eshappa house to Erappa house in Block 2, Abdul Latif house to Abdul Khan house in Block 3, Shankreppa Hudagi house to Bangla Sultan in Block 3, Asur khan to Gulam sab Kirana Shop in Block 4, Chinumiya house to Akram house in Block 4, Nisar Ahemmed house to Jabber Papad in Block 3&4, Urdu School to Zameer Sunar house in Block 3&4, Naseer Tower to Mahebub Mosen house in Block 1, Muneer Tambuli house to Dastagir Khuran in Block 1, Usman ali house TO Sharif Khureshi house in Block 1& 2, Abdul Zalil house to Mustak Husain havaladar (Near Darga)in Block 1, Khayum house to Mousque in Block 1, Phozaz ali house to Khaser Pasha house in Block 1, BT Road to Police Station in Block 7, Babumiya mouli house to Husain sab house in Block 5, Basavanappa house to Kashinath Dhanur house in Block 5, Maruti Gorgi house to Channappa Andoor house in Block 5, Margemma Temple to PKPS in Block no.1, Gram Panchayath to Dilip Bawagi house in Block 4&5, Old ING Vysya Bank building to Sharfuddin tadpalli house in Block 2&3, Bituminous Road from Police Station to Urdu school (Main Road) in Block 2,3,5, Bituminous Road from Bus stand to State highway via PHC & darga, Gram Panchayath to Dilip Bawagi in Block 4&5, Malshetty Poshetty house to graveyard in Block 6, and Fhakroddin Arbaj ali house to Vikram house in Block 7 in BAGDAL Village, BIDAR Taluka70.0021/09/201670.00015/12/201670.00022/05/201706/10/201767.94007/10/201767.94067.940CompletedCompleted 14/08/2019 12:56:33
118 BDR1642231402016-17MICROBidarBidarMarkundaGeneralInfrastructureRoads & BridgesOthersOthersPREDPRED BhalkiCEO15/07/2016CONSTRUCTION OF CC ROAD AND DRAIN from NH-9 to Hanuman Temple, Karibasappa Asram (Matha) to Hanamanth Biradar house in MARKUNDA VILLAGE, BIDAR Taluka CONSTRUCTION OF CC ROAD AND DRAIN from NH-9 to Hanuman Temple, Karibasappa Asram (Matha) to Hanamanth Biradar house in MARKUNDA VILLAGE, BIDAR Taluka 20.0021/09/201620.00004/11/201620.00021/01/201731/03/201717.97031/03/201717.97017.970CompletedCompleted 14/08/2019 12:56:57
119 BDR1642231412016-17MICROBidarBidarBhangoorGeneralInfrastructureRoads & BridgesOthersOthersPREDPRED BhalkiCEO15/07/2016CONSTRUCTION OF CC ROAD AND DRAIN from Gurunath Panchal house to Chandrakanth Patil house, Rajkumar Patil house to Laxmi Temple & Chandrkanth Patil house to Manohar Panchal house in BHANGOOR VILLAGE, BIDAR TalukaCONSTRUCTION OF CC ROAD AND DRAIN from Gurunath Panchal house to Chandrakanth Patil house, Rajkumar Patil house to Laxmi Temple & Chandrkanth Patil house to Manohar Panchal house in BHANGOOR VILLAGE, BIDAR Taluka15.4421/09/201615.44004/11/201615.44021/01/201722/03/201714.62022/03/201714.62014.530CompletedCompleted  14/08/2019 12:57:34
120 BDR1652110442016-17MICROBidarBasvakalyanRajeshwarSCP InstitutionalSWOthersOthersPREDPRED BasvakalyanCEO15/07/2016 ಮೇಟ್ರಿಕ್ ಪೂರ್ವ ಬಾಲಕರ ವಸತಿ ನಿಲಯ ರಾಜೇಶ್ವರಕ್ಕೆ ಅಡುಗೆ ಕೋಣೆ ಹಾಗೂ ಡೈನಿಂಗ್ ಹಾಲನ್ನು ನಿರ್ಮಾಣ. .[including electrification,exhunt fan ,light and plug points provision]10.0021/09/201610.00013/10/201610.00024/11/201630/01/20179.22031/01/20179.2209.220CompletedPhysically Completed  16/08/2019 10:11:11
121 BDR1652120472016-17MICROBidarBasvakalyanOthersTSP InstitutionalSWOthersOthersPREDPRED BasvakalyanCEO15/07/2016 ಮೇಟ್ರಿಕ್ ಪೂರ್ವ ಬಾಲಕರ ವಸತಿ ನಿಲಯ ಎರಬಾಗಕ್ಕೆ ಅಡುಗೆ ಕೋಣೆ ಹಾಗೂ ಡೈನಿಂಗ್ ಹಾಲನ್ನು ನಿರ್ಮಾಣ.[including electrification,exhunt fan ,light and plug points provision]10.0021/09/201610.00013/10/201610.00024/11/201630/01/20179.74031/01/20179.7409.070CompletedCompleted 14/08/2019 12:58:38
122 BDR1652122382016-17MICROBidarBasvakalyanGadigondgaonTSP InstitutionalEducationOthersOthersPREDPRED BasvakalyanCEO19/12/2016Construction of Additional 03 Rooms at Govt High School Gadlegaon (B)village. (Including Electrification.Fan &Light fitting and plug provision)Construction of Additional 03 Rooms at Govt High School Gadlegaon (B)village. (Including Electrification.Fan &Light fitting and plug provision)19.5024/12/201619.50005/01/201719.50021/01/201724/03/201718.97024/03/201718.97018.030CompletedCompleted 14/08/2019 12:59:17
123 BDR1652130482016-17MICROBidarBasvakalyanRajeshwarGeneralInstitutionalHealthOthersOthersPREDPRED BasvakalyanCEO15/07/2016 ಸಮುದಾಯ ಆರೋಗ್ಯ ಕೇಂದ್ರ ರಾಜೇಶ್ವರ ಗ್ರೂಪ ಡಿ ನೌಕರರ ವಸತಿ ಗೃಹ ನಿರ್ಮಾಣ. [including electrification,water supply,and sanitation]6.0021/09/20166.00013/10/20166.00024/11/201630/01/20175.35031/01/20175.3505.270CompletedCompleted 14/08/2019 13:00:01
124 BDR1652130502016-17MICROBidarBasvakalyanBasavakalyan (CMC)GeneralInstitutionalEducationOthersOthersPWDPWD BasvakalyanDC15/07/2016Construction of government junior college,additional three rooms ,Basvakalyan.[including electrification,fan lights and plug points provision]Construction of government junior college,additional three rooms ,Basvakalyan.[including electrification,fan lights and plug points provision]22.5014/10/201622.50013/02/201722.50017/01/201725/02/201722.06025/02/201719.90019.900Completedcompleted 20/06/2019 12:03:18
125 BDR1652130512016-17MICROBidarBasvakalyanMantalaGeneralInstitutionalEducationOthersOthersPREDPRED BasvakalyanCEO15/07/2016Construction of additional 2 Class rooms at Government High school Manthal [including electrification,fan lights and plug points provision]Construction of additional 2 Class rooms at Government High school Manthal [including electrification,fan lights and plug points provision]13.0021/09/201613.00004/11/201613.00024/11/201613/02/201711.99014/02/201711.99011.990CompletedCompleted 14/08/2019 13:00:24
126 BDR1652130522016-17MICROBidarBasvakalyanTadolaGeneralInstitutionalEducationOthersOthersPREDPRED BasvakalyanCEO15/07/2016 ತಡೋಳಾ ಸ.ಹಿ.ಪ್ರಾ ಶಾಲೆಗೆ (ಕನ್ನಡ) ಹಾಗೂ (ಉರ್ದು) ಹೆಚ್ಚುವರಿ ಕೋಣೆ ನಿರ್ಮಾಣ [including electrification,fan lights and plug points provision]13.0021/09/201613.00004/11/201613.00024/11/201630/01/201711.78031/01/201711.78011.760CompletedPhysically Completed 14/08/2019 13:00:49
127 BDR1652132292016-17MICROBidarBasvakalyanMudbiGeneralInstitutionalSWOthersOthersPREDPRED BasvakalyanCEO21/09/2016Construction of pre-matric Boys Hostel 50 Boys 5 No rooms Mudbi village (Including Electrification,Fan & Light Fitting and Plug Provision)Construction of pre-matric Boys Hostel 50 Boys 5 No rooms Mudbi village (Including Electrification,Fan & Light Fitting and Plug Provision)35.0029/12/201635.00005/01/201735.00021/01/201724/03/201731.60024/03/201731.60030.620CompletedCompleted 14/08/2019 13:11:15
128 BDR1652132302016-17MICROBidarBasvakalyanHarkudGeneralInstitutionalSWOthersOthersPREDPRED BasvakalyanCEO21/09/2016Construction of pre-matric Boys Hostel 50 Boys 5 No rooms harkud village (Including Electrification,Fan & Light Fitting and Plug Provision)Construction of pre-matric Boys Hostel 50 Boys 5 No rooms harkud village (Including Electrification,Fan & Light Fitting and Plug Provision)35.0029/12/201635.00005/01/201735.00021/01/201703/05/201733.47003/05/201733.47022.180CompletedCompleted 14/08/2019 13:11:48
129 BDR1652132312016-17MICROBidarBasvakalyanJanwadaGeneralInstitutionalEducationOthersOthersPREDPRED BasvakalyanCEO21/09/2016Construction of additional 3 rooms Govt School at Janwada village (Including Electrification,Fan & Light Fitting and Plug Provision)Construction of additional 3 rooms Govt School at Janwada village (Including Electrification,Fan & Light Fitting and Plug Provision)19.5024/12/201619.50005/01/201719.50024/03/201711/05/201719.27011/05/201719.27018.960CompletedCompleted 14/08/2019 13:14:15
130 BDR1652132322016-17MICROBidarBasvakalyanHarkudGeneralInstitutionalEducationOthersOthersPWDPWD BasvakalyanDC21/09/2016Construction of additional 5 rooms Govt School at Harkud village (Including Electrification,Fan & Light Fitting and Plug Provision)Construction of additional 5 rooms Govt School at Harkud village (Including Electrification,Fan & Light Fitting and Plug Provision)32.5023/11/201632.50030/12/201632.50002/01/201717/01/201728.55019/01/201728.55028.510Completedcompleted 20/06/2019 12:04:00
131 BDR1652132332016-17MICROBidarBasvakalyanOthersGeneralInstitutionalEducationOthersOthersPWDPWD BasvakalyanDC21/09/2016Construction of additional 5 rooms Govt School at Chitta village (Including Electrification,Fan & Light Fitting and Plug Provision)Construction of additional 5 rooms Govt School at Chitta village (Including Electrification,Fan & Light Fitting and Plug Provision)32.5023/11/201632.50030/12/201632.50002/01/201717/01/201728.53019/01/201728.53028.400Completedcompleted 20/06/2019 12:04:33
132 BDR1652132342016-17MICROBidarBasvakalyanUmapurGeneralInstitutionalEducationOthersOthersPWDPWD BasvakalyanDC21/09/2016Construction of additional 5 rooms at Govt primary School Ummapur (Including Electrification,Fan & Light Fitting and Plug Provision)Construction of additional 5 rooms at Govt primary School Ummapur (Including Electrification,Fan & Light Fitting and Plug Provision)32.5015/12/201632.50030/12/201632.50002/01/201717/01/201729.68019/01/201729.68029.530Completedcompleted 20/06/2019 12:06:12
133 BDR1652210572016-17MICROBidarBasvakalyanOthersSCP InfrastructureRoads & BridgesOthersOthersPWDPWD BasvakalyanDC15/07/2016Providing CC Road and Drain with Lad Masjid to BSNL office 200mtrs at Basavakalyan TqProviding CC Road and Drain with Lad Masjid to BSNL office 200mtrs at Basavakalyan Tq10.0014/10/201610.00004/11/201610.00011/11/201608/12/20169.72016/12/20169.3209.210CompletedCompleted 20/06/2019 12:07:51
134 BDR1652210582016-17MICROBidarBasvakalyanOthersSCP InfrastructureRoads & BridgesOthersOthersPWDPWD BasvakalyanDC15/07/2016Construction C C Road & Drain Babuvithoba House to Tajodin Kaddewala (Engineering Shop) 200Mtr ward no 14 at Sharanagar (SC) Colony Basavakalyan CityConstruction C C Road & Drain Babuvithoba House to Tajodin Kaddewala (Engineering Shop) 200Mtr ward no 14 at Sharanagar (SC) Colony Basavakalyan City10.0014/10/201610.00014/11/201610.00011/11/201608/12/20169.73016/12/20169.1608.530CompletedCOMPLETED 06/03/2019 12:57:38
135 BDR1652210602016-17MICROBidarBasvakalyanOthersSCP InfrastructureRoads & BridgesOthersOthersPWDPWD BasvakalyanDC15/07/2016Construction of CC drain Revan siddeshwar house to siddeshwar Temple to Dharmprakash School 350 Ft (SC) at sharanyya colony Basavakalyan city Construction of CC drain Revan siddeshwar house to siddeshwar Temple to Dharmprakash School 350 Ft (SC) at sharanyya colony Basavakalyan city 10.0014/10/201610.00004/11/201610.00011/11/201608/12/20169.73016/12/20169.3309.180CompletedCOMPLETED 06/03/2019 12:57:38
136 BDR1652210612016-17MICROBidarBasvakalyanOthersSCP InfrastructureRoads & BridgesOthersOthersPWDPWD BasvakalyanDC15/07/2016Providing C C Road & Drains from Shivajingar Mainalle sir house to Channamma Gurayya Hiremath House 200 Mtr in Basavakalyan City Providing C C Road & Drains from Shivajingar Mainalle sir house to Channamma Gurayya Hiremath House 200 Mtr in Basavakalyan City 10.0014/10/201610.00004/11/201610.00011/11/201608/12/20169.92016/12/20168.5105.100CompletedCOMPLETED 06/03/2019 12:57:38
137 BDR1652210622016-17MICROBidarBasvakalyanOthersSCP InfrastructureRoads & BridgesOthersOthersPWDPWD BasvakalyanDC15/07/2016Construction of Drain Vaijinath House to Hanmanthppa swamy House 100 Mtr ft at ashrya colony Basavakalyan city & Providing C C Road Jaffer from house to main Raod 100 Mtr at Ashreya colony Basavakalyan city Construction of Drain Vaijinath House to Hanmanthppa swamy House 100 Mtr ft at ashrya colony Basavakalyan city & Providing C C Road Jaffer from house to main Raod 100 Mtr at Ashreya colony Basavakalyan city 10.0014/10/201610.00004/11/201610.00011/11/201608/12/20169.95016/12/20168.9508.960CompletedCOMPLETED 20/06/2019 12:09:52
138 BDR1652210632016-17MICROBidarBasvakalyanOthersSCP InfrastructureRoads & BridgesOthersOthersPWDPWD BasvakalyanDC15/07/2016Improvements of Road from Banjara Colony to BK-Hulsoor Main Road at Basavakalyan City Improvements of Road from Banjara Colony to BK-Hulsoor Main Road at Basavakalyan City 23.0023/11/201623.00030/12/201623.00002/01/201717/01/201719.39019/01/201719.39019.060CompletedCOMPLETED 06/03/2019 12:57:38
139 BDR1652210642016-17MICROBidarBasvakalyanOthersSCP InfrastructureRoads & BridgesOthersOthersPREDPRED BasvakalyanCEO15/07/2016Providing CC road From Laxmi Temple to Gandhi Katta at Village Gokul via Parit house Gokul Tq: Basavakalyan Providing CC road From Laxmi Temple to Gandhi Katta at Village Gokul via Parit house Gokul Tq: Basavakalyan 10.0021/09/201610.00013/10/201610.000 02/02/20178.58003/02/20178.5807.500CompletedCompleted 06/03/2019 12:57:42
140 BDR1652210652016-17MICROBidarBasvakalyanOthersSCP InfrastructureRoads & BridgesOthersOthersPREDPRED BasvakalyanCEO15/07/2016Providing CC Road From Mangwada Ningawwa house to Dharam Shala at village Batgera Tq: Basavakalyan & Main road wadi to PKPS Bank 300mtrProviding CC Road From Mangwada Ningawwa house to Dharam Shala at village Batgera Tq: Basavakalyan & Main road wadi to PKPS Bank 300mtr10.0021/09/201610.00013/10/201610.00024/11/201702/02/20179.20003/02/20179.2009.150CompletedCompleted  14/08/2019 13:14:51
141 BDR1652210662016-17MICROBidarBasvakalyanOthersSCP InfrastructureRoads & BridgesOthersOthersPREDPRED BasvakalyanCEO15/07/2016Providing C C Road from Keshav Natkar house to Vishwamber Suryvanshi house 200 Mtr at Village Ladwanti Tq: BasavakalyanProviding C C Road from Keshav Natkar house to Vishwamber Suryvanshi house 200 Mtr at Village Ladwanti Tq: Basavakalyan10.0021/09/201610.00013/10/201610.00024/11/201702/02/20178.30002/02/20178.3008.030CompletedCompleted  14/08/2019 13:15:12
142 BDR1652210672016-17MICROBidarBasvakalyanOthersSCP InfrastructureRoads & BridgesOthersOthersPREDPRED BasvakalyanCEO24/10/2017Providing C C Road from Babu Gaikwad house to Srimanth Gaikwad house 250 Mtr at Village Waddargaon Tq: BasavakalyanConstruction of C.C Road from Machindra Gaikwad house to Srimanth Gaikwad house at Waddargaon Village Basavakalyan Taluka11.8419/03/201811.84016/02/201811.84016/02/201814/03/201811.21026/03/201811.21011.170CompletedCompletedChange of work approved from hkrdb on 24.10.2017 06/03/2019 12:57:42
143 BDR1652210682016-17MICROBidarBasvakalyanOthersSCP InfrastructureRoads & BridgesOthersOthersPREDPRED BasvakalyanCEO15/07/2016 ಮಾಶಾಳ ತಾಂಡ ರಸ್ತೆ ನಿರ್ಮಾಣ ಮಾಡುವುದು.10.0021/09/201610.00010/11/201610.00024/11/201630/01/20178.76031/01/20178.7608.760CompletedCompleted 14/08/2019 13:15:39
144 BDR1652210692016-17MICROBidarBasvakalyanOthersSCP InfrastructureRoads & BridgesOthersOthersPREDPRED BasvakalyanCEO15/07/2016 ಧನಗರ ವಾಡಿ ದಿಂದ ರೋಳಾವರೆಗೆ ರಸ್ತೆ ನಿರ್ಮಾಣ17.6521/09/201617.65004/11/201617.65015/12/201627/02/201714.19028/02/201714.19014.140CompletedCompleted  14/08/2019 13:16:06
145 BDR1652210702016-17MICROBidarBasvakalyanOthersSCP InfrastructureWater SupplyOthersOthersRWSRWS BasvakalyanCEO15/07/2016Providing Augmentation of Piped Water Supply at Gadigoundgaon Village Tq: Basavakalyan Providing Augmentation of Piped Water Supply at Gadigoundgaon Village Tq: Basavakalyan 15.0021/09/201615.00008/11/201615.000 28/12/201614.66004/02/201612.85012.840CompletedPhysically Completed 06/03/2019 12:57:49
146 BDR1652210712016-17MICROBidarBasvakalyanOthersSCP InfrastructureWater SupplyOthersOthersRWSRWS BasvakalyanCEO15/07/2016Providing Augmentation of Piped Water Supply at Bhosga Village Tq: Basavakalyan Providing Augmentation of Piped Water Supply at Bhosga Village Tq: Basavakalyan 49.0021/09/201649.00007/01/201749.000 20/03/201747.30005/05/201744.07037.690CompletedCompletedCompleted06/03/2019 12:57:49
147 BDR1652212392016-17MICROBidarBasvakalyanOthersSCP InfrastructureRoads & BridgesOthersOthersPREDPRED BasvakalyanCEO21/09/2016Providing CC Road from Dayanand Suryavanshi SC Shmashan Bhoomi at Jajanmugli VillageProviding CC Road from Dayanand Suryavanshi SC Shmashan Bhoomi at Jajanmugli Village10.0008/12/201610.00012/12/201610.00021/01/201717/03/20178.79018/03/20178.7908.510CompletedCompleted  14/08/2019 13:16:28
148 BDR1652220722016-17MICROBidarBasvakalyanOthersTSP InfrastructureRoads & BridgesOthersOthersPWDPWD BasvakalyanDC15/07/2016Providing C C Road at Rikshwa Colony to Rajkimar ward No. 5 at Basavakalyan City 200Mtr Providing C C Road at Rikshwa Colony to Rajkimar ward No. 5 at Basavakalyan City 200Mtr 10.0015/12/201610.00020/12/201610.00002/01/201717/01/20178.86019/01/20178.8608.860CompletedCompleted 20/06/2019 12:10:51
149 BDR1652220732016-17MICROBidarBasvakalyanOthersTSP InfrastructureRoads & BridgesOthersOthersPWDPWD BasvakalyanDC15/07/2016Providing CC Drains with Top Slab infornt of Hanuman temple to Bhavani temple ST Colony Main Road Tripurant Providing CC Drains with Top Slab infornt of Hanuman temple to Bhavani temple ST Colony Main Road Tripurant 12.0014/10/201612.00017/12/201612.00002/01/201717/01/201710.55019/01/201710.55010.450CompletedCompleted 20/06/2019 12:11:19
150 BDR1652220742016-17MICROBidarBasvakalyanOthersTSP InfrastructureRoads & BridgesOthersOthersPWDPWD BasvakalyanDC15/07/2016Providing CC Road from Laxman Shivaram Makade house to Narsing Mallesha Devnale house in Village Ilhal tq Basavakalyan Providing CC Road from Laxman Shivaram Makade house to Narsing Mallesha Devnale house in Village Ilhal tq Basavakalyan 12.0014/10/201612.00017/12/201612.00002/01/201717/01/201710.41019/01/201710.41010.390CompletedCompleted 20/06/2019 12:11:52
151 BDR1652220752016-17MICROBidarBasvakalyanOthersTSP InfrastructureRoads & BridgesOthersOthersPREDPRED BasvakalyanCEO15/07/2016Providing CC Road Berasha Sharanappa Pujari House to ambary Jamadar house, Rajappa Pujari House to Ashok Dhabu House & Sharnamma Jaganna Pujari house Maruti Pujari house (ST) 450 Mtr at Kohinoor Village Tq: BKProviding CC Road Berasha Sharanappa Pujari House to ambary Jamadar house, Rajappa Pujari House to Ashok Dhabu House & Sharnamma Jaganna Pujari house Maruti Pujari house (ST) 450 Mtr at Kohinoor Village Tq: BK15.3421/09/201615.34004/11/201615.34021/01/201721/03/201713.05022/03/201713.05013.040CompletedCompleted 14/08/2019 13:18:41
152 BDR1652220762016-17MICROBidarBasvakalyanOthersTSP InfrastructureRoads & BridgesOthersOthersPMGSYPMGSY BasvakalyanCEO15/07/2016 ಎಮ್.ಎಸ್. ಬಾರ್ಡರ ದಿಂದ ಹುಲಸೂರ ದಿಂದ ಮಹಾಗಾಂವ ವರೆಗೆ ರಸ್ತೆ ನಿರ್ಮಾಣ (ಕಿ.ಮೀ 37.00 ರಿಮದ 39.00)36.0716/11/201636.07006/01/201736.07031/01/201708/05/201735.62030/06/201735.62035.470Completedcompletedcompleted 06/03/2019 12:57:45
153 BDR1652220772016-17MICROBidarBasvakalyanOthersTSP InfrastructureWater SupplyOthersOthersPMGSYPMGSY BasvakalyanCEO15/07/2016Improvements to Road from Yalladgundi to Bhosga from km 0.00 2.0km in Basavakalyan Taluka Improvements to Road from Yalladgundi to Bhosga from km 0.00 2.0km in Basavakalyan Taluka 45.0013/10/201645.00003/11/201645.00031/01/201708/05/201744.09030/06/201744.09034.050CompletedPhysically completed IInd & Part Bill Recived (Rs.21.14 lakhs) 06/03/2019 12:57:45
154 BDR1652220782016-17MICROBidarBasvakalyanOthersTSP InfrastructureWater SupplyOthersOthersRWSRWS BasvakalyanCEO15/07/2016Providing Augmentation of Piped Water Supply at Kohinoor Village Tq: Basavakalyan Providing Augmentation of Piped Water Supply at Kohinoor Village Tq: Basavakalyan 30.0021/09/201630.00008/11/201630.000 14/03/201726.21003/05/201729.87018.570CompletedPhysically CompletedPhysically Completed04/04/2019 14:06:13
155 BDR1652220792016-17MICROBidarBasvakalyanOthersTSP InfrastructureRoads & BridgesOthersOthersRWSRWS BasvakalyanCEO15/07/2016Providing Augmentation of Piped Water Supply at Jajanmugli Village Tq: Basavakalyan Providing Augmentation of Piped Water Supply at Jajanmugli Village Tq: Basavakalyan 40.0021/09/201640.00007/01/201740.000 20/03/201739.45003/05/201738.26038.020Completedಬೌತಿಕವಾಗಿ ಪೂರ್ಣಗೊಂಡಿದೆ. ಬೌತಿಕವಾಗಿ ಪೂರ್ಣಗೊಂಡಿದೆ.06/03/2019 12:57:49
156 BDR1652230802016-17MICROBidarBasvakalyanBasavakalyan (CMC)GeneralInfrastructureRoads & BridgesOthersOthersPWDPWD BasvakalyanDC15/07/2016Providing CC Drains from NGO Colony to via Narshetty Petrolpump upto Bridge At Tripurant Basavakalyan City Providing CC Drains from NGO Colony to via Narshetty Petrolpump upto Bridge At Tripurant Basavakalyan City 15.0014/10/201615.00026/11/201615.00007/12/201624/12/201613.12006/01/201713.12031.120CompletedCOMPLETED 20/06/2019 12:23:32
157 BDR1652230822016-17MICROBidarBasvakalyanBasavakalyan (CMC) WARD NO.-0018GeneralInfrastructureRoads & BridgesOthersOthersPWDPWD BasvakalyanDC15/07/2016Providing CC road From Shivareddy house to Kore house at Ganga Colony Ward NO. 18 Basavakalyan Providing CC road From Shivareddy house to Kore house at Ganga Colony Ward NO. 18 Basavakalyan 12.0014/10/201612.00006/01/201712.00017/01/201713/02/201711.93004/03/201710.3908.600CompletedCOMPLETED 20/03/2019 17:30:59
158 BDR1652230832016-17MICROBidarBasvakalyanBasavakalyan (CMC)GeneralInfrastructureRoads & BridgesOthersOthersPWDPWD BasvakalyanDC15/07/2016Providing C C Road Vakare House to Rajkumar Khandre house 300Mtr Hiremath Colony Basvakalyan CityProviding C C Road Vakare House to Rajkumar Khandre house 300Mtr Hiremath Colony Basvakalyan City10.0014/10/201610.00004/11/201610.00011/11/201608/12/20169.95016/12/20168.3508.350CompletedCOMPLETED 20/06/2019 12:16:28
159 BDR1652230842016-17MICROBidarBasvakalyanBasavakalyan (CMC)GeneralInfrastructureRoads & BridgesOthersOthersPWDPWD BasvakalyanDC15/07/2016Providing C C Road Deepak Gudda House to Babu Bunna House 300Mtr Gudda Colony Basavakalyan CityProviding C C Road Deepak Gudda House to Babu Bunna House 300Mtr Gudda Colony Basavakalyan City10.3115/12/201610.31030/12/201610.31002/01/201717/01/20178.66019/01/20178.6608.180CompletedCOMPLETED 20/03/2019 17:32:40
160 BDR1652230852016-17MICROBidarBasvakalyanBasavakalyan (CMC) WARD NO.-0019GeneralInfrastructureRoads & BridgesOthersOthersPWDPWD BasvakalyanDC15/07/2016Providing C C Road From Vaijappa Panchal house to Govind Rathod house at Ward No. 19 Basavakalyan City 250mtr Providing C C Road From Vaijappa Panchal house to Govind Rathod house at Ward No. 19 Basavakalyan City 250mtr 11.0015/12/201611.00030/12/201611.00002/01/201717/01/20179.06019/01/20179.0608.790CompletedCOMPLETED 20/03/2019 17:36:41
161 BDR1652230862016-17MICROBidarBasvakalyanBasavakalyan (CMC) WARD NO.-0018GeneralInfrastructureRoads & BridgesOthersOthersPWDPWD BasvakalyanDC15/07/2016Providing CC Road from Sidram Yenagunde House to Umesh Shilwant house at Ward No. 18, Basavakalyan City Providing CC Road from Sidram Yenagunde House to Umesh Shilwant house at Ward No. 18, Basavakalyan City 10.0011/01/201710.00016/02/201710.00025/02/201725/03/20179.97025/03/20178.5107.500CompletedCompleted 20/03/2019 17:37:13
162 BDR1652230872016-17MICROBidarBasvakalyanBasavakalyan (CMC) WARD NO.-0010GeneralInfrastructureRoads & BridgesOthersOthersPWDPWD BasvakalyanDC15/07/2016Providing C C Road From Nazim house to Mahebook Ali house at Allah nagar Ward No. 10 Basavakalyan City 200Mtr Providing C C Road From Nazim house to Mahebook Ali house at Allah nagar Ward No. 10 Basavakalyan City 200Mtr 10.0014/10/201610.00004/11/201610.00011/11/201608/12/20169.75016/12/20168.3207.940CompletedCOMPLETED 20/03/2019 17:37:51
163 BDR1652230882016-17MICROBidarBasvakalyanBasavakalyan (CMC) WARD NO.-0003GeneralInfrastructureRoads & BridgesOthersOthersPWDPWD BasvakalyanDC15/07/2016Providing C C Road & CC Drain From Sharnappa Vithal Vai Balaji Temple to Hanuman Temple ward No. 3 at Kali Galli Basavakalyan City 200Mtr Providing C C Road & CC Drain From Sharnappa Vithal Vai Balaji Temple to Hanuman Temple ward No. 3 at Kali Galli Basavakalyan City 200Mtr 10.0014/10/201610.00004/11/201610.00011/11/201608/12/20169.72016/12/20168.1609.220CompletedCOMPLETED 20/06/2019 12:20:17
164 BDR1652230892016-17MICROBidarBasvakalyanBasavakalyan (CMC)GeneralInstitutionalHealthOthersOthersPWDPWD BasvakalyanDC15/07/2016Construction of Public Toilets (Pay & use) at Govt. Hospital Basavakalyan Construction of Public Toilets (Pay & use) at Govt. Hospital Basavakalyan 12.0014/10/201612.00013/11/201612.00007/12/201626/12/201610.21006/01/201710.2107.270Completedcompleted 20/03/2019 17:39:13
165 BDR1652230902016-17MICROBidarBasvakalyanChicknagaonGeneralInfrastructureRoads & BridgesOthersOthersPMGSYPMGSY BasvakalyanCEO15/07/2016 ಚಿಕ್ಕನಾಗಾಂವದಿಂದ ಜನವಾಡಾ ರಸ್ತೆ ಕಿ.ಮೀ 0.00 ದಿಂದ 2.80100.0015/07/2016100.00010/02/2017100.00010/02/201705/06/201790.11030/06/201790.11078.160CompletedPhysically completed Physically completed-IVth & part Bill Recived (Rs.10.75lakhs)20/03/2019 17:40:30
166 BDR1652230912016-17MICROBidarBasvakalyanKohinoorGeneralInfrastructureRoads & BridgesOthersOthersPMGSYPMGSY BasvakalyanCEO15/07/2016Improvement To road from Kohinoor to pahad ladvnthi from 0.00to 2.70 km. At Basavakalyan Taluka Improvement To road from Kohinoor to pahad ladvnthi from 0.00to 2.70 km. At Basavakalyan Taluka 75.0013/10/201675.00007/01/201775.00031/01/201727/05/201773.85029/06/201773.85059.070CompletedPhysically completed IVth & Part Bill (Rs.24.85 lakhs) Recived20/03/2019 17:41:17
167 BDR1652230922016-17MICROBidarBasvakalyanKhanapurGeneralInfrastructureRoads & BridgesOthersOthersPMGSYPMGSY BasvakalyanCEO15/07/2016Approach Road From Kahanpur Village to ODP Road from 0.00 to 1.5km Kahanpur Village Basavkaalyan Taluka Approach Road From Kahanpur Village to ODP Road from 0.00 to 1.5km Kahanpur Village Basavkaalyan Taluka 50.0002/11/201650.00019/12/201650.00031/01/201727/05/201749.20029/06/201749.20024.910Completedphysically completed IVth & Part Bill (Rs. 19.00 lakhs) Recieved20/03/2019 17:42:33
168 BDR1652230932016-17MICROBidarBasvakalyanDevnalGeneralInfrastructureRoads & BridgesOthersOthersPMGSYPMGSY BasvakalyanCEO15/07/2016Improvement to road from Baasavanwadi to Devnal Village from km. 00.00 to 2.0kmImprovement to road from Baasavanwadi to Devnal Village from km. 00.00 to 2.0km70.0013/10/201670.00007/01/201770.00031/01/201727/05/201769.24029/06/201769.24047.230CompletedPhysically CompletedPhysically completed 20/03/2019 17:45:40
169 BDR1652230942016-17MICROBidarBasvakalyanRajeshwarGeneralInfrastructureRoads & BridgesOthersOthersPMGSYPMGSY BasvakalyanCEO15/07/2016 ರಾಜೇಶ್ವರ ದಿಂದ ಎನ್.ಎಚ್-9 ವಾಯ್ ಹಂದ್ರಾಳವರೆಗೆ ರಸ್ತೆ ನಿರ್ಮಾಣ (ಕಿ.ಮೀ 0.00 ರಿಂದ 5.00)80.0002/11/201680.00007/01/201780.00031/01/201727/05/201778.94029/06/201778.94057.010Completedphysically completedIVth & Part bil (Rs.15.28) Recived 20/03/2019 17:46:08
170 BDR1652230952016-17MICROBidarBasvakalyanYerbaghGeneralInfrastructureRoads & BridgesOthersOthersPMGSYPMGSY BasvakalyanCEO15/07/2016 ಯರಬಾಗ ದಿಂದ ರಾಂಪೂರ ವಾಡಿವರೆಗೆ ರಸ್ತೆ ನಿರ್ಮಾಣ (ಕಿ.ಮೀ 0.00 ರಿಂದ 5.00)43.8613/10/201643.86003/11/201643.86031/01/201727/05/201743.54029/06/201743.54030.110CompletedPhysically completedIVth & Part bill (Rs.8.73 laksh) Recived 20/03/2019 17:46:59
171 BDR1652230962016-17MICROBidarBasvakalyanUjlamGeneralInfrastructureRoads & BridgesOthersOthersPREDPRED BasvakalyanCEO24/10/2017Providing CC Road From Hanuman Temple to Gram Panchyat at Village Ujlamb Tq : Basavakalyan 350 Mtr. Construction of CC Road From Hanuman Temple to Sri.Kishor at Ujlamb Basavakalyan Taluka10.0019/03/201810.00012/02/201810.00016/02/201817/03/20188.32019/05/20188.3207.740CompletedCompleted 10/04/2019 14:52:59
172 BDR1652232362016-17MICROBidarBasvakalyanBasavakalyan (CMC)GeneralInfrastructureRoads & BridgesOthersOthersPWDPWD BasvakalyanDC21/09/2016Providing LED Dual carriage pole with two lights in the middle of the road Ambedkar circle to bus stand road in BasvakalyanProviding LED Dual carriage pole with two lights in the middle of the road Ambedkar circle to bus stand road in Basvakalyan90.0017/01/201790.00010/03/201790.00030/03/201720/06/201783.25030/06/201773.03037.550Completedcompleted  10/08/2019 18:20:34
173 BDR1611230032016-17MACROBidarAuradDangargaonGeneralInfrastructureRoads & BridgesRural RoadsOthersPMGSYPMGSY BidarCEO03/02/2017 Construction of road 4km to 5km from Donagaon to Murki village in Aurad Taluka131.1720/12/2017159.46027/12/2017159.46005/01/201824/02/2018156.68019/03/2018144.080112.340Completedphysically completed 20/03/2019 17:49:37
174 BDR161123272016-17CMDQBidarAuradHolesamudraGeneralInfrastructureRoads & BridgesRural RoadsOthersPREDPRED AuradCEO24/04/2017 Construction of CC Road & Drain from Chandrakanth Kadam hosue to Ankush Biradar house at Holesamundra village10.0013/12/201710.00001/01/201810.00002/01/201805/02/20188.77003/07/20188.7707.000CompletedPhysically Completed 20/03/2019 17:53:18
175 BDR1614230612016-17GDQBidarAuradAurad (TP)GeneralInfrastructureRoads & BridgesRural RoadsOthersPREDPRED AuradCEO14/12/2016 Construction of CC Road in Ram Nagar at Aurad (B) town10.0003/09/20178.94003/04/20178.94024/03/201712/05/20178.84005/12/20178.8407.250CompletedCompleted 14/08/2019 13:19:04
176 BDR1614230632016-17GDQBidarAuradKamalnagar (CT)GeneralInfrastructureRoads & BridgesRural RoadsOthersKRIDLKRIDL BidarCEO14/12/2016 ಬೀದರ್ ಜಿಲ್ಲೆ ಔರಾದ್ ತಾಲ್ಲೂಕಿನ ಕಮಲಾನಗರ ಜಿಲ್ಲಾ ಪಂಚಾಯತಿ ವ್ಯಾಪ್ತಿಯ ಹುಲಸೂರು ಗ್ರಾಮದ ಪ್ರಾಥಮಿಕ ಶಾಲೆಗೆ ಕಾಂಪೌಂಡ್ ನಿರ್ಮಾಣ ಕಾಮಗಾರಿ10.0024/02/201810.00003/09/201810.000  0.00024/02/201810.0009.900CompletedCompletedGeneral20/03/2019 17:59:12
177 BDR1621220762016-17MACROBidarBhalkiOthersTSP InfrastructureRoads & BridgesRural RoadsOthersPREDPRED BhalkiCEO11/03/2017 ಭಾಲ್ಕಿ ತಾಲ್ಲೂಕಿನ ನಾಗರಾಳ ಗ್ರಾಮವನ್ನು ಗ್ರಾಮ ವಿಕಾಸ ಯೋಜನೆ ಮಾದರಿ ಅನ್ವಯ ಆಂತರಿಕ ರಸ್ತೆ ಮತ್ತು ಚರಂಡಿ ನಿರ್ಮಾಣ.50.0028/12/201750.00021/12/201650.00002/02/201805/03/201844.85015/03/201844.85044.750CompletedCompleted 10/04/2019 14:55:46
178 BDR1621230122016-17MACROBidarBhalkiOthersGeneralInfrastructureRoads & BridgesRural RoadsOthersPWDPWD BhalkiDC11/05/2016 Widening and strengthening of Aurad-Sadashivgadh(SH-34) road km 53.30 to 56.00 in Bhalki taluka296.3019/01/2017296.30023/03/2017296.30022/08/201703/11/2017292.65012/11/2017292.650277.240Completedcompleted 13/08/2019 13:51:36
179 BDR1621230132016-17MACROBidarBhalkiOthersGeneralInfrastructureRoads & BridgesRural RoadsOthersPWDPWD BhalkiDC11/05/2016 Widening and strengthening of Aurad-Sadashivgadh(SH-34) road km 50.50 to 53.30 in Bhalki taluka310.0519/01/2017310.05023/03/2017310.05004/04/201721/09/2017310.05010/10/2017310.050188.790Completed  19/06/2019 15:26:03
180 BDR1621230142016-17MACROBidarBhalkiDongapurGeneralInfrastructureRoads & BridgesRural RoadsOthersPWDPWD BhalkiDC28/10/2016 Formation of road from Dongapur village to Bhalki main road length-3.97 km in Bhalki taluka191.6011/08/2016191.60012/09/2016191.60001/08/201720/03/2017189.00024/03/2017189.000186.610CompletedCompleted 13/08/2019 13:54:19
181 BDR1621230152016-17MACROBidarBhalkiBeeri (K)GeneralInfrastructureRoads & BridgesRural RoadsOthersPWDPWD BhalkiDC26/10/2016 Formation of road from Biri (k) to Kotkyal village 3.48 Km in Bhalki taluka198.5011/07/2016198.50012/09/2016198.50012/12/201631/03/2017195.84005/06/2017195.840188.140Completedcompleted 24/06/2019 11:41:49
182 BDR1621230162016-17MACROBidarBhalkiJaigaonGeneralInfrastructureRoads & BridgesRural RoadsOthersPWDPWD BhalkiDC02/09/2017 Construction of road from Jaigaon village to Telgaon Cross in Bhalki Tq. Of Bidar Dist.179.0803/08/2017179.08006/05/2017179.09001/01/201727/10/2017176.68015/11/2017176.680168.580Completed completed 24/06/2019 11:42:17
183 BDR1621230172016-17MACROBidarBhalkiKoroorGeneralInfrastructureRoads & BridgesRural RoadsOthersPWDPWD BhalkiDC02/09/2017 Formation of road from Gorchincholi to Koroor (H) in Bhalki Tq. Of Bidar Dist.69.9020/04/201769.90006/05/201769.90001/01/201701/11/201769.16015/11/201769.16068.470Completedcompleted 24/06/2019 11:42:47
184 BDR1621230192016-17MACROBidarBhalkiMehkarGeneralInfrastructureRoads & BridgesRural RoadsOthersPWDPWD BhalkiDC01/06/2017 Construction of four lane road in village limit of Mehkar on Kesarjawlga Alwai road from km 11.20 to 11.690 in Bhalki Taluka Dist. Bidar94.4301/06/201794.43023/03/201794.43030/03/201713/09/201794.43010/10/201798.77093.750Completedcompleted  24/06/2019 11:43:44
185 BDR1621230732016-17MACROBidarBhalkiBhalki (TMC)GeneralInfrastructureRoads & BridgesRural RoadsOthersPWDPWD BhalkiDC11/03/2017 Re construction of bridge on Bhalki Chincholi SH-75 (km 7.10)105.0012/12/201796.00029/12/201796.00001/01/201823/03/201894.86026/03/201898.86067.090Completed completed letter sent to ee pwd frm hkrdb regarding tender premium on 27/2/201820/03/2019 18:35:06
186 BDR1624230642016-17GDQBidarBhalkiWarwattiGeneralInfrastructureRoads & BridgesRural RoadsOthersPREDPRED BhalkiCEO14/12/2016 Construction of CC Road at Warwatti (B) village in Bhalki Tq10.0002/10/20179.70021/02/20169.70024/03/201712/05/20178.480 8.4808.420CompletedCompleted 16/08/2019 10:11:34
187 BDR1631230082016-17MACROBidarHumnabadHallikhed (B)GeneralInfrastructureRoads & BridgesRural RoadsOthersPREDPRED HumnabadCEO20/12/2016 Improvement of road from Hallikhed (B) to Markhal village of Length 5.440 km in Humnabad Tq.216.1018/01/2017184.30020/04/2017184.30022/05/201708/11/2017160.40011/08/2017160.400135.480CompletedPhysically Completed 14/08/2019 13:19:30
188 BDR1631230092016-17MACROBidarHumnabadKabeerabadGeneralInfrastructureRoads & BridgesRural RoadsOthersPREDPRED HumnabadCEO29/12/2016 Improvement of road from Kabirabad Wadi to Namadapur village in Humnabad Tq.193.5202/03/2017193.52020/04/2017193.52022/05/201728/09/2017190.00028/09/2017190.000189.950CompletedCompleted 16/08/2019 10:13:15
189 BDR1631230102016-17MACROBidarHumnabadWalkhandiGeneralInfrastructureRoads & BridgesRural RoadsOthersPREDPRED HumnabadCEO21/10/2015 Formation of Road From Walkhandi Village to Gandi patwada of length 3.364 km Humnabad Taluka137.3012/05/2016134.50023/01/2017134.50022/05/201731/10/2017129.91031/10/2017129.910125.170CompletedCompleted 16/08/2019 10:13:32
190 BDR1631230112016-17MACROBidarHumnabadBothagiGeneralInfrastructureRoads & BridgesRural RoadsOthersPREDPRED HumnabadCEO11/05/2016 Improvement of Approach Road to Botagi Village of Length 1.430km in Humnabad Taluka, Bidar Dist.76.0014/12/201676.00023/01/201776.00008/03/201713/06/201766.92013/06/201766.92066.550CompletedCompleted 16/08/2019 10:13:55
191 BDR1641130232016-17MACROBidarBidarBidar (CMC + OG)GeneralInfrastructureWater SupplyRural Water SupplyOthersCMC DC13/01/2017 RO plant at basavagiri in Bidar 12.0028/09/201712.00005/10/201712.00003/03/201813/03/201812.00020/03/201810.90010.620CompletedWork CompletedWork Completed21/03/2019 15:28:36
192 BDR1641130382016-17MACROBidarBidarGhodepalliGeneralInstitutionalSocialOthersOthersKRIDLKRIDL BidarCEO19/10/2016  M.Y Ghorpade G. P Building Gudpalli50.0026/02/201856.88028/02/201856.880  0.00028/02/201856.88056.310CompletedCompleted & Handed overಮಂಡಳಿಯ ಆದೇಶ ಸಂಖ್ಯೆ: 2924, ದಿ: 30/12/2017ರನ್ವಯ, ಕಾಮಗಾರಿಯ ಅನುಷ್ಠಾನವನ್ನು NK ಯಿಂದ KRIDL ಗೆ ಬದಲಾವಣೆ ಮಾಡಲಾಗಿದೆ.16/08/2019 12:16:22
193 BDR1641230072016-17MACROBidarBidarOthersGeneralInfrastructureRoads & BridgesRural RoadsOthersPREDPRED BhalkiCEO11/05/2016 Construction of Road and Drains of Chidari Village survey No. 12 Shrishidaramaya layout of BUDA in Bidar Taluka289.1004/07/2017316.16011/01/2017289.10003/03/201718/01/2018316.16002/05/2018316.160289.110CompletedPhysically Completedಸಂಖ್ಯೆ:ಹೈ.ಕ.ಪ್ರ.ಅ.ಮಂ/ಯೋಶಾ/ಕ್ರಿಯೋ/ಮ್ಯಾಕ್ರೋ-2/ಬೀದರ/61/2016-17/917 ದಿನಾಂಕ:25/05/2019 ರನ್ವಯ ಸದರಿ ಕಾಮಗಾರಿಗೆ ಮುಂದೆ ಜರಗುವ ಮಂಡಳಿ ಸಭೆಯಲ್ಲಿ ಘಟನ್ನೋತ್ತರ ಮಂಜೂರಾತಿ ನೀಡುವ ಷರತ್ತಿಗೆ ಒಳಪಟ್ಟು ಕಾಮಗಾರಿಯ ಅಂದಾಜು ಮೊತ್ತವನ್ನು ರೂ.3,16,16,042.98 ಹೆಚ್ಚುವರಿ ಮೊತ್ತಕ್ಕೆ ಪರಿಷ್ಕೃತ ಆಡಳಿತಾತ್ಮಕ ಅನುಮೋದನೆ ನೀಡಿ ಹಾಗೂ ಸದರಿ ಕಾಮಗಾರಿಗೆ ತಗಲುವ ಹೆಚ್ಚುವರಿ ಮೊತ್ತ ರೂ. 27,06,042.00 ವನ್ನು 2019-20 ನೇ ಸಾಲಿನ ಕ್ರಿಯಾ ಯೋಜನೆಯಲ್ಲಿ ಮಂಜೂರು ನೀಡುವ ಷರತ್ತಿಗೊಳಪಟ್ಟು ಆದೇಶಿಸಲಾಗಿದೆ.30/07/2019 19:03:09
194 BDR1641230392016-17MACROBidarBidarBidar (CMC + OG)GeneralInstitutionalOthersOthersOthersPWDPWD BidarDC07/10/2017 Const of Bus Shelter at Mangalper Chowk in Bidar Taluka & Bidar Dist6.5029/08/20176.50009/11/20176.50027/01/201822/03/20186.44023/03/20186.4404.620Completed  21/03/2019 15:38:53
195 BDR1641230402016-17MACROBidarBidarBidar (CMC + OG)GeneralInstitutionalOthersOthersOthersPWDPWD BidarDC07/10/2017 Const of Bus Shelter at Naubad in Bidar Taluka & Bidar Dist6.5029/08/20176.50009/11/20176.50027/01/201822/03/20186.44023/03/20186.4404.620Completed  21/03/2019 15:39:36
196 BDR1641230412016-17MACROBidarBidarBidar (CMC + OG)GeneralInstitutionalOthersOthersOthersPWDPWD BidarDC07/10/2017 Const of Bus Shelter at Chidri Road in Bidar Taluka & Bidar Dist6.5029/08/20176.50009/11/20176.50015/11/201715/12/20176.45030/12/20175.0403.630Completed  21/03/2019 15:40:23
197 BDR1641230422016-17MACROBidarBidarBidar (CMC + OG)GeneralInfrastructureUrban InfrastructureTransportOthersPWDPWD BidarDC07/10/2017 Const of Bus Shelter at Vidynagar in Bidar Taluka & Bidar Dist6.5029/08/20176.50009/11/20176.50027/01/201822/03/20186.45023/03/20186.4404.620CompletedCompleted 21/03/2019 15:40:57
198 BDR1641230432016-17MACROBidarBidarBidar (CMC + OG)GeneralInstitutionalOthersOthersOthersPWDPWD BidarDC07/10/2017 Const of Bus Shelter at Gumpa ring road in Bidar Taluka & Bidar Dist6.5029/08/20176.50009/11/20176.50027/01/201822/03/20186.45023/03/20186.4504.620CompletedCompleted 21/03/2019 15:41:47
199 BDR1641230442016-17MACROBidarBidarBidar (CMC + OG)GeneralInstitutionalOthersOthersOthersPWDPWD BidarDC07/10/2017 Const of Bus Shelter at Bhavani mandir Mangalpet in Bidar Taluka & Bidar6.5029/08/20176.50009/11/20170.00027/01/201822/03/20186.45023/03/20186.4504.660Completed  21/03/2019 15:42:24
200 BDR1641230452016-17MACROBidarBidarBidar (CMC + OG)GeneralInstitutionalOthersOthersOthersPWDPWD BidarDC07/10/2017 Const of Bus Shelter at Pratapnagar in Bidar Taluka & Bidar Dist6.5028/08/20176.50009/11/20176.50027/01/201822/03/20186.45022/03/20186.4504.620Completed  13/08/2019 14:48:20
201 BDR1641230462016-17MACROBidarBidarBidar (CMC + OG)GeneralInstitutionalOthersOthersOthersPWDPWD BidarDC07/10/2017 Const of Bus Shelter at Mailooor ring road in Bidar Taluka & Bidar Dist6.5029/08/20176.50009/11/20176.50027/01/201822/03/20186.45023/03/20186.4504.620CompletedCompleted 21/03/2019 15:44:40
202 BDR1641230472016-17MACROBidarBidarBidar (CMC + OG)GeneralInstitutionalOthersOthersOthersPWDPWD BidarDC07/10/2017 Const of Bus Shelter at RTO office in Bidar Taluka & Bidar Dist6.5029/08/20176.50009/11/20176.50027/01/201822/03/20186.45023/03/20186.4504.620CompletedCompleted 21/03/2019 15:45:13
203 BDR1641230482016-17MACROBidarBidarBidar (CMC + OG)GeneralInstitutionalOthersOthersOthersPWDPWD BidarDC07/10/2017 Const of Bus Shelter at KEB office in Bidar Taluka & Bidar Dist6.5029/08/20176.50009/11/20176.50027/01/201822/03/20186.45023/03/20186.4504.620CompletedCompleted 21/03/2019 15:45:49
204 BDR1641230492016-17MACROBidarBidarBidar (CMC + OG)GeneralInstitutionalOthersOthersOthersPWDPWD BidarDC07/10/2017 Const of Bus Shelter at Narsimha Zarna in Bidar Taluka & Bidar Dist6.5029/08/20176.50009/11/20176.50027/01/201822/03/20186.45023/03/20186.4504.620CompletedCompleted 21/03/2019 15:46:29
205 BDR1641230502016-17MACROBidarBidarBidar (CMC + OG)GeneralInstitutionalOthersOthersOthersPWDPWD BidarDC07/10/2017 Const of Bus Shelter at water tank in Bidar Taluka & Bidar Dist6.5029/08/20176.50009/11/20176.50027/01/201822/03/20186.45023/03/20186.4504.610Completed  21/03/2019 16:17:46
206 BDR1641230512016-17MACROBidarBidarBidar (CMC + OG)GeneralInstitutionalOthersOthersOthersPWDPWD BidarDC07/10/2017 Const of Bus Shelter at chowbara in Bidar Taluka & Bidar Dist6.5029/08/20176.50009/11/20176.50015/11/201715/12/20176.45001/01/20185.0303.640Completed  21/03/2019 16:18:40
207 BDR1641230522016-17MACROBidarBidarBidar (CMC + OG)GeneralInstitutionalOthersOthersOthersPWDPWD BidarDC07/10/2017 Const of Bus Shelter at Gandhi gunj in Bidar Taluka & Bidar Dist6.5029/08/20176.50009/11/20176.50028/01/201822/03/20186.45023/03/20186.4504.830CompletedCompleted 21/03/2019 16:19:03
208 BDR1641230532016-17MACROBidarBidarBidar (CMC + OG)GeneralInstitutionalOthersOthersOthersPWDPWD BidarDC07/10/2017 Const of Bus Shelter at Bomgondeshwar in Bidar Taluka & Bidar Dist6.5008/07/20176.50009/11/20176.50015/11/201715/12/20176.45001/01/20185.0303.640Completed  21/03/2019 16:20:37
209 BDR1641230542016-17MACROBidarBidarBidar (CMC + OG)GeneralInstitutionalOthersOthersOthersPWDPWD BidarDC07/10/2017 Const of Bus Shelter at Mailoor cross in Bidar Taluka & Bidar Dist6.5029/08/20176.50009/11/20176.50015/11/201715/12/20176.45001/01/20186.0004.410Completedcompleted 18/06/2019 13:54:19
210 BDR1641230552016-17MACROBidarBidarShahpurGeneralInstitutionalOthersOthersOthersPWDPWD BidarDC07/10/2017 Const of Bus Shelter at Shahapur gate in Bidar Taluka & Bidar Dist6.5029/08/20176.50009/11/20176.50015/11/201715/12/20176.45001/01/20185.0503.920CompletedCompleted 21/03/2019 16:22:48
211 BDR1641230562016-17MACROBidarBidarBidar (CMC + OG)GeneralInstitutionalOthersOthersOthersPWDPWD BidarDC07/10/2017 Const of Bus Shelter at Basaveshwar circle in Bidar Taluka & Bidar Dist6.5029/08/20176.50009/11/20176.50015/11/201715/12/20176.45001/01/20186.0004.650CompletedCompleted 21/03/2019 16:23:15
212 BDR1641230572016-17MACROBidarBidarBidar (CMC + OG)GeneralInstitutionalOthersOthersOthersPWDPWD BidarDC07/10/2017 Const of Bus Shelter at Madivaleshwar circle in Bidar Taluka & Bidar Dist6.5029/08/20176.50009/11/20176.50028/01/201822/03/20186.45023/03/20186.4504.660Completedwork under progress 21/03/2019 16:23:41
213 BDR1641230582016-17MACROBidarBidarBidar (CMC + OG)GeneralInstitutionalOthersOthersOthersPWDPWD BidarDC07/10/2017 Const of Bus Shelter at Shivnagar (South) in Bidar Taluka & Bidar Dist6.5009/11/20176.50027/01/20186.50028/02/201822/03/20186.45023/03/20186.4504.660Completedwork under progress 13/08/2019 14:01:51
214 BDR1641233282016-17CMDQBidarBidarBarurGeneralInfrastructureRoads & BridgesRural RoadsOthersPREDPRED BhalkiCEO24/04/2017 Construction of CC Road & Drain from Sanjeev Marpalli hosue to Narsappa hosue at Baroor village10.0013/12/201710.00028/12/201710.00002/02/201805/02/20188.33028/02/20188.3307.910CompletedCompleted 11/08/2019 16:03:17
215 BDR1641233292016-17CMDQBidarBidarKamthanaGeneralInfrastructureRoads & BridgesRural RoadsOthersPREDPRED BhalkiCEO24/04/2017 Providing B.T. Road from KEB to Shah Abdul Razaq Dargah at Kamthana village10.0013/12/201710.00028/12/201710.00002/02/201831/01/20188.76002/05/20188.7608.600CompletedCompleted 11/08/2019 16:01:58
216 BDR1644230592016-17GDQBidarBidarSindholGeneralInfrastructureRoads & BridgesRural RoadsOthersPREDPRED BhalkiCEO14/12/2016 Construction of CC Road from Zakir Hotel to Rajkumar house at Sindol village10.0009/03/20179.43014/03/20179.43024/03/201712/05/20178.14005/12/20178.1407.740CompletedCompleted 14/08/2019 13:19:52
217 BDR1644230602016-17GDQBidarBidarOthersGeneralInfrastructureRoads & BridgesRural RoadsOthersPREDPRED BhalkiCEO26/04/2017 ಬೀದರ ಜಿಲ್ಲೆ ಔರಾದ ತಾಳೂಕಿನ ಕಮಲಾನಗರ ಜಿಲ್ಲಾ ಪಂಚಯತ ವ್ಯಾಪ್ತಿಯ ಕಾಳಗಾಪೂರ ನೀವೃತ್ತಿ ಮನೆಯಿಂದ ಎಸ್. ಸಿ ವಾರ್ಡ ವರೆಗೆ ಸಿ.ಸಿ ರಸ್ತ ನಿರ್ಮಾಣ10.0027/12/201710.00001/10/201810.00023/01/201816/02/20188.48026/03/20188.4800.000CompletedPhysically Completed 14/08/2019 10:41:51
218 BDR1644230622016-17GDQBidarAuradDabka(Chawar)SCP InfrastructureRoads & BridgesRural RoadsBT RoadPREDPRED BhalkiCEO14/12/2016 Construction of Road from Laskar Naik Tanda to Keshev Naik tanda Approach road at Laskar Naik tanda in aurad taluka of bidar district10.0003/09/201710.00014/03/201710.00024/03/201720/05/20177.57020/05/20177.5706.050CompletedPhysically Completed 16/08/2019 10:14:13
219 BDR1651130202016-17MACROBidarBasvakalyanBasavakalyan (CMC)GeneralInfrastructureWater SupplyRural Water SupplyOthersRWSRWS BasvakalyanCEO01/05/2017 ಕೋಹಿನೂರು ವಾಡಿ ಮನೆಗಳಿಗೆ ಕುಡಿಯುವ ನೀರು ಸರಬರಾಜು ಮಾಡಲು ಓ.ಹೆಚ್.ಟಿ ಯಿಂದ ರಾಮಚಂದ್ರ ಕಂಟೆನೂರೆ ಮನೆ ಮತ್ತು ಓ.ಹೆಚ್.ಟಿ ಯಿಂದ ಹನುಮಾನ ಮಂದಿರ ಹಾಗೂ ಓ.ಹೆಚ್.ಟಿಯಿಂದ ಶಂಕರ ಪೂಜಾರಿ ಮನೆಯವರೆಗೆ ಜಿ.ಐ ಪೈಪಲೈನ ನಿಮರ್ಾಣ.14.0001/05/201714.00025/01/201714.00026/10/201722/12/201711.84001/10/201811.8408.200CompletedPhysically completed 21/03/2019 16:33:39
220 BDR1651230042016-17MACROBidarBasvakalyanBasavakalyan (CMC)GeneralInfrastructureRoads & BridgesRural RoadsOthersPREDPRED BasvakalyanCEO17/03/2017 Construction of CC Road and CC Drain, PVC Pipe line & Chamber from Kohinoor Swarajnagar School to Sub Register Office & From Main road to PHC Guest House Basavakalyan Taluka22.9028/12/201722.90028/02/201822.90007/07/201823/04/201818.85019/05/201818.85017.420CompletedCompleted 14/08/2019 10:42:13
221 BDR1651230052016-17MACROBidarBasvakalyanKohinoorGeneralInfrastructureRoads & BridgesRural RoadsOthersPREDPRED BasvakalyanCEO02/09/2017 Construction of PVC Pipe Drain, Chamber CC road in Kohinoor Pahad34.3020/03/201734.30019/04/201734.30029/07/201730/10/201728.73030/10/201728.73028.730CompletedCompleted 14/08/2019 13:20:21
222 BDR16512312016-17CMDQBidarBasvakalyanRamteerth (K)GeneralInfrastructureRoads & BridgesRural RoadsOthersPREDPRED BasvakalyanCEO24/04/2017 Construction of Road from Ramthirth (K) village to Korhalli Maharashtra Border via Ramlingheshwar temple at Ramthirth (K) village10.0013/12/201710.00023/12/201710.00002/02/201805/02/20188.51017/03/20188.5108.500CompletedCompleted 14/08/2019 10:42:37
223 BDR1658130822016-17DGSNDBidarBasvakalyanOthersGeneralInstitutionalOthersULB AmenitiesOthersHKRDB HKRDB30/03/2017 1.8 CUM ACE HOPPER TIPPER BS 414.8530/03/201714.85030/03/201714.85030/03/201730/03/201714.85030/03/201714.85014.100Completed 100% Payment made19/08/2019 19:02:48
                 8821.82 8843.270 8809.740  8163.470 8511.3707728.640